My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-19_REPORT - C2009087 (7)
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2013-04-19_REPORT - C2009087 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:41 PM
Creation date
4/23/2013 9:57:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REPORT
Doc Date
4/19/2013
Doc Name
2012 Testing For revegetation Success for Phase III Bond Release Year One of Two
From
Peabody Sage Creek Mining, LLC
To
DRMS
Permit Index Doc Type
Reveg Monitoring Report
Email Name
JDM
DIH
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
208
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTRODUCTION 1 <br />METHODS 1 <br />PHASE III BOND RELEASE BLOCK (BRB) PSCM -2 SAMPLING 1 <br />REFERENCE AREA SAMPLING 1 <br />SUMMARY OF SAMPLING DESIGN 1 <br />COVER SAMPLING 2 <br />HERBACEOUS PRODUCTION SAMPLING 2 <br />WOODY PLANT DENSITY SAMPLING 2 <br />LIFEFORMS USED IN DATA PRESENTATION 3 <br />PLANT SPECIES FREQUENCY AND DENSITY MEASUREMENTS 3 <br />PLANT SPECIES LISTING 3 <br />PHOTOGRAPHIC RECORD 4 <br />STATISTICAL METHODS 4 <br />ASSESSMENT OF RECLAMATION ADEQUACY 4 <br />General 4 <br />Determination of Sample Adequacy 4 <br />Notes on the Development of Reference Area — Based Performance Standards 5 <br />Hypothesis Testing Approaches 5 <br />WOODY PLANT DENSITY EVALUATION 9 <br />CLIMATIC DATA 10 <br />RESULTS 11 <br />2012 PHASE III BRB PSCM -2 11 <br />Cover 11 <br />Production 12 <br />Woody Plant Density 12 <br />2012 MOUNTAIN BRUSH REFERENCE AREA 13 <br />Cover 13 <br />Production 13 <br />2012 SAGEBRUSH REFERENCE AREA 13 <br />Cover 13 <br />Production 14 <br />DISCUSSION 14 <br />CLIMATIC CONDITIONS 14 <br />SAMPLE ADEQUACY CALCULATIONS 14 <br />2012 ASSESSMENT OF BRB PSCM -2 FOR COMPLIANCE WITH PHASE III PERFORMANCE STANDARDS 15 <br />I <br />
The URL can be used to link to this page
Your browser does not support the video tag.