Laserfiche WebLink
Total acres <br />backfilled: <br />/ <br />Total acres <br />seeded w/ <br />approved mix: <br />� <br />Total acres <br />w /topsoil <br />replaced: <br />/ 04 <br />Total acres <br />mulched w/ <br />approved mulch: <br />Montrose <br />Total acres <br />graded: <br />...0Z <br />Total acres <br />fertilized w/ <br />apvd fertilizer: <br />/,t <br />Topsoil <br />replacement <br />depth (in.): <br />/v /,l <br />Mulch application <br />rate (tons /ac): <br />��f <br />/ / <br />Seed <br />application <br />method: <br />3-, .::; <br />Fertilizer <br />application <br />method: <br />,,4/ e) <br />Mulch <br />method: <br />/l' // <br />Permittee Name: <br />Cotter Corporation <br />Permit Number: <br />P- 2009 -021 <br />Operation Name: <br />CM -25 <br />County: <br />Montrose <br />Annual Fee Due: <br />$86.00 <br />Anniversary Date: <br />April 1, 2013 <br />Permit Acreage: <br />0.00 <br />Current Bond Amt: <br />$100.00 <br />frf T A PT' <br />MP Annual Report <br />According to Colorado Statute, each year, on the anniversary date of the permit, an operator shall submit the Annual Fee, <br />an Annual Report and Map showing the extent of current disturbances to affected land, required monitoring information, <br />reclamation accomplished to date and during the preceding year, any new disturbance that is anticipated to occur during <br />the upcoming year, any reclamation that will be performed during the upcoming year, the dates for the beginning of active <br />operations, and the date active operations ceased for the year. <br />Information contained in this report is required and will be reviewed by the Division upon receipt and prior to the next <br />compliance inspection of the site. If, while completing this report, you learn that your site is not in compliance with the <br />rules and the act, it is advisable that the issues be rectified promptly to avoid possible enforcement action. <br />1. Is the affected area boundary clearly marked if you have an excavation or portal? <br />2. Is the site in final reclamation? <br />If "YES," please note time limits related to completion of reclamation, Rule 3.1.3. <br />3. What was the date of last exploration activity? ( Z <br />4. What date did prospecting activity end, or what date is it expected to end? Rule 5.6.1(e). !/i► 2 i4..) <br />5. Number of acres currently affected (exploration+ incomplete reclamation). ..Q� <br />RIED Number of acres that were newly affected during the current4ar` `J <br />7. Number of acres that were reclaimed during the current report year. � 7013 <br />8. Estimated new acreage to be affected in the next report year. IVISION OF RECLAMATION <br />MINING AND SAFETY <br />9. Estimated acres to be reclaimed in the next report year. <br />10. Total acres in various stages of reclamation, since permitted exploration activities began: <br />11. Is weed control being conducted in accordance with an approved Weed Control Plan? YES NO <br />If "YES ", indicate the weed species, control area, control type, application rate and treatment date on the re <br />12. Is adequate topsoil reserved for reclamation, based on your approved NOI? <br />If "NO ", please explain: <br />Page 2 of 4 <br />YES NO <br />ES NO /r <br />.�Z <br />NO N/A <br />