Laserfiche WebLink
QUARTERLY <br />Operator: <br />Mine: <br />Pond Identification <br />Location <br />Status During Inspection: <br />Approximate Water Level <br />Sediment (% total storage) <br />Outflow (cfs) <br />POND INSPECTION <br />REPORT <br />Quarter: <br />Inspection Date: <br />McClane Canyon Mining LLC <br />First 2013 <br />McClane Canyon Mine C -80 -004 <br />14- Mar -13 <br />Sediment <br />Pond <br />Pool (5455.5) <br />0% <br />0 <br />Features <br />Problem <br />Yes /No <br />Erosional <br />Rills & Gulleys <br />Inadequate Vegetation <br />Outlet Channel Erosion <br />Burrows <br />Other <br />No <br />No <br />No <br />No <br />No <br />Structural <br />Differential Settling <br />Cracks or Slides <br />Seepage <br />Other <br />No <br />No <br />No <br />No <br />Appurtenant Structures <br />Defective Spillways <br />Dewatering Devices Clogged <br />Faulty Gates, Etc. <br />Other <br />No <br />No <br />No <br />No <br />Additional Comments Pool is 1.5 feet below the invert of the primary spillway. <br />Invert of primary spillway is at elevation 5457.00. <br />Invert of emergency spillway is at elevation 5462.00. <br />Maintenance Required: None 4 <br />cl <br />t o <br />Name of Inspector: Jim Stover <br />�� ' /S74 <br />v ��; � / 1 <br />M <br />• e <br />• a 4 <br />� � '�� <br />*Alike, y1 �� �! � , <br />x4elo <br />J. • e ®F0L0rY- C� <br />col() ant • Date <br />ft.art <br />