Laserfiche WebLink
Land Status Category <br />CumLast ears <br />ulative Total <br />This Calendar Year <br />Cumulative Total' <br />Total acres disturbed <br />62.6 <br />5.2 <br />67.8 <br />Redisturbed acres <br />56.4 <br />1.8 <br />58.2 <br />Newly disturbed acres <br />6.2 <br />3.4 <br />9.6 <br />Acres backfilled and graded <br />0.0 <br />0.0 <br />0.0 <br />Acres topsoiled <br />0.0 <br />0.0 <br />0.0 <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2012 <br />Peabody Sage Creek Mine <br />Mine Name <br />C- 2009 -087 <br />Permit # <br />Address: 36600 Routt County Road #27, P.O. Box 250, Hayden, CO 81639 <br />Peabody Sage Creek Mining LLC <br />Permitee <br />This report, required by Rule 2.04 13, is due by February 15 of each year, or other date (March 31), as <br />agreed upon by the Division. It should include text, discussion, and maps, at a minimum, in addition to any <br />other reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report <br />Seeding typically begins the minimum 10 -year liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br />*Include if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 1855.4 and the total number of acres: <br />Phase 1 released 1657.6 Phase II released 1161.6 <br />Phase 111 released 0.0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 67.8 <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 67.8 <br />Acreage in active mining areas 0.0 <br />'(exclude acres where Phase III release has been achieved) <br />2 lncludes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion <br />and collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and <br />construction areas; office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal <br />conveyors; refuse piles and coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and <br />entryways; and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />3 lncludes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />Last Years <br />Cumulative <br />Total <br />This Calendar <br />Year <br />Cumulative <br />Total' <br />10 Years or <br />Less <br />Greater than <br />10 Years <br />Acres Seeded* <br />0 <br />0.0 <br />0 <br />0.0 <br />0 <br />Colorado Division of Reclamation, Mining and Safety <br />Annual Reclamation Report for the Year 2012 <br />Peabody Sage Creek Mine <br />Mine Name <br />C- 2009 -087 <br />Permit # <br />Address: 36600 Routt County Road #27, P.O. Box 250, Hayden, CO 81639 <br />Peabody Sage Creek Mining LLC <br />Permitee <br />This report, required by Rule 2.04 13, is due by February 15 of each year, or other date (March 31), as <br />agreed upon by the Division. It should include text, discussion, and maps, at a minimum, in addition to any <br />other reclamation monitoring data as required by the approved permit. The location of the acreage reported <br />under each land status category and year of seeding (if applicable) should be clearly and accurately <br />identified on a map included with the report <br />Seeding typically begins the minimum 10 -year liability period. Please report the acres for each category <br />below. Do not include acres that have achieved final, Phase III release. <br />*Include if necessary, a description of any augmented seeding or cultural practices <br />For the Entire Life of Mine, the total number of acres disturbed 1855.4 and the total number of acres: <br />Phase 1 released 1657.6 Phase II released 1161.6 <br />Phase 111 released 0.0 <br />For Mines in Permanent Cessation: <br />Total acreage in facilities subject to reclamation but yet to be completed 67.8 <br />For Government Performance and Results Act <br />Acreage in long -term mining or reclamation facilities 67.8 <br />Acreage in active mining areas 0.0 <br />'(exclude acres where Phase III release has been achieved) <br />2 lncludes haul and access roads; temporary dams and impoundments; permanent dams and impoundments; diversion <br />and collector ditches, water and air monitoring sites; topsoil stockpiles; overburden stockpiles; repair, storage and <br />construction areas; office area, repair shops, and parking; coal stockpiles, loading, and processing areas; railroads; coal <br />conveyors; refuse piles and coal mine waste impoundments; head -of- hollow fills; valley fills; ventilation shafts and <br />entryways; and noncoal waste disposal area (garbage dumps and coal combustion by- products disposal areas). <br />3 lncludes pits, topsoil stripped areas in advance of pits, and spoil not backfilled and graded <br />