My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-19_REPORT - C2009087 (6)
DRMS
>
Day Forward
>
Report
>
Coal
>
C2009087
>
2013-04-19_REPORT - C2009087 (6)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:41 PM
Creation date
4/19/2013 11:17:26 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REPORT
Doc Date
4/19/2013
Doc Name
2012 Annual Reclamation Report
From
Peabody Sage Creek Mining, LLC
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
JDM
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Pond <br />Number <br />2006 2008 <br />Capacity Capacity <br />2010 <br />Capacity <br />2012 <br />Capacity <br />Minimum Allowable <br />Water Storage <br />Pond 002 <br />171.9 NA <br />NA <br />Not surveyed <br />84.6 ac.ft. <br />Pond 003 <br />3.7 NA <br />NA <br />Not surveyed <br />2.1 ac.ft. <br />Pond 004 <br />5.6 1 5.5 <br />5.5 <br />Not surveyed <br />3.0 ac.ft. <br />engineer. The submitted reports will comply with all requirements of Rule 4.05.9(15). Ponds <br />are also visually inspected quarterly by mine personnel. During these inspections, any drastic <br />change in sedimentation storage or sudden increase in a sediment delta at the inlet to the pond <br />would be detected which could require mitigation. To ensure adequate capacities, and taking <br />into consideration the level of revegetation of previously surface mined surveys, PSCM will <br />commit to capacity surveys every 10 years beginning in 2016. <br />The following table lists the latest surveyed capacities of PSCM sediment ponds: <br />Table 12.4 <br />Sediment Pond Capacities <br />STOCK TANKS <br />There are 13 stock tanks in the PSCM mined /reclaimed area and are all classified as permanent <br />and are certified annually. No new stock tanks were constructed during the 2012 season. <br />WILDLIFE MONITORING <br />Wildlife monitoring was conducted in cooperation with CPW during 2012. The work included: <br />• Monitoring of Golden Eagle nest sites. <br />— A total of 6 sites were identified in Spring 2012 for monitoring. Three were believed to <br />have been destroyed by natural causes. The remaining three nests were monitored. All <br />were inactive during 2012. <br />• Monitoring four (4) known Columbian sharp- tailed grouse leks and checking for new ones <br />Following are the grouse counts at the 4 established leks on the PSCM reclaimed area. <br />— Seneca Mine 1 Lek 14 males <br />Seneca Mine 2 Lek 12 males <br />Seneca Mine 3 Lek 22 males <br />— Seneca Mine 4 Lek 9 males <br />LITERATURE CITED <br />2012 ARR 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.