My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-04-15_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:32 PM
Creation date
4/19/2013 10:53:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
4/15/2013
Doc Name
Proposed Revised Pages
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR78
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2.05.3 <br />Bowie -2 MR -123 approved six gob vent holes to be drilled in 2011. They <br />are GVB -B11A, B11B, B12A, B12B, B12C & B13A. MR -124 approved <br />two additional holes to be drilled in 2011. They are GVB -B11C and B12D. <br />GVB -B12A, B12B, B12C & B13A were drilled in 2012. <br />Bowie -2 TR -73 approved ten gob vent holes and three exploration holes. <br />They are GVB -B12E, GVB -B13B, GVB -B13C, GVB- B13D,GVB -B13E, <br />GVB -B14A, GVB -B14B, GVB -B14C, GVB -B14D, GVB -B14E, SS -6 <br />SS -7 and 2012 -1. GVB -B12E, GVB -B13B, GVB -B13C, GVB- B13D,GVB- <br />B13E, GVB -B14A, SS -7 and 2012 -1 were drilled in 2012. <br />Bowie -2 MR -133 approved the 2012 installation of four utility holes to be <br />installed north of the large ventilation fan above the D -Seam portals. MR- <br />133 also approved the 2012 installation of GVB -13F. <br />Bowie -2 MR -134 approved the installation of an emergency vent hole into <br />the B13 tailgate bleeder entry. Due to technical difficulties this vent hole <br />was not installed. The drill pad for the emergency hole was constructed. <br />Bowie -2 MR -135 approved the 2013 installation of an emergency gob <br />vent hole for the B13 panel (GVB- B13C -1). <br />Bowie -2 TR -78 approved the 2013 installation of six gob vent holes and <br />one exploration hole. They are GVB -B14F, GVB -B15A, GVB -B15B, GVB - <br />B15C, GVB -B15D, GVB -B16A and exploration hole SS -8. <br />TR -78 2.05 - 49 - 04/13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.