My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1996083 (3)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-04-15_REVISION - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:32 PM
Creation date
4/19/2013 10:53:25 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
REVISION
Doc Date
4/15/2013
Doc Name
Proposed Revised Pages
From
J.E. Stover & Associates, Inc
To
DRMS
Type & Sequence
TR78
Email Name
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
MINE ENGINEERING CIVIL ENGINEERING <br />MINE RECLAMATION CONST. MANAGEMENT <br />April 10, 2013 <br />J. E. STOVER & ASSOCIATES, INC. <br />2352 NORTH 7 STREEET, UNIT B <br />GRAND JUNCTION, COLORADO 81501 <br />PHONE: (970) 245 -4101, FAX 242 -7908 <br />Susan Burgmaier <br />Division of Reclamation, Mining & Safety <br />1313 Sherman St., Room 215 <br />Denver, CO 80203 <br />Re: Bowie Resources, LLC, Bowie No. 2 Mine <br />Technical Revision #78, Six GVB & One Exploration Hole <br />Permit C- 1996 -083 <br />Dear Ms. Burgmaier: <br />R! VED <br />APR 15 2.013 <br />Division of Reclamation, <br />Safety <br />Mining <br />On behalf of Bowie Resources, LLC, (BRL), enclosed is an application for a technical <br />revision to install six gob vent holes and drill one exploration hole. <br />Project Summary <br />Gob vent holes are required over all longwall panels. This revision proposes one <br />additional GVB for panel 14 (GVB- B14F), four GVBs for panel 15 and one GVB for <br />panel 16. One exploration hole is also proposed by this revision. There was some <br />minor realignment of GVBs B14B, B14C, B14D and B14E however the overall change <br />in road length and disturbed area is negligible. The changes in road length and <br />disturbed area are incorporated in the table on Map 9. The projected dates of road <br />disturbance and drill pad construction were also updated on Map 9. <br />Right of Entry <br />Right of entry is granted by BRL's Federal Coal lease subject to analysis of impacts by <br />the surface management agency. Exploration hole SS -8 and its associated road are <br />located on land managed by the BLM. GVB -B14F and associated road are located on <br />BRL surface. GVBs B15B, B15C and B15D and associated roads are located on <br />surface owned by Turkey Track Ranch. The Surface Access Agreement between BRL <br />and Turkey Track Ranch has previously been incorporated into the permit in Volume III, <br />Tab 1. GVB B15A, B16A and associated roads are located on surface owned by Derby <br />Mountain, LLLP. BRL should have a surface access agreement with Derby Mountain, <br />LLLP in the next 30 days. <br />Affected and Disturbed Area <br />There will be 10.1 acres of new disturbance. The affected area will increase 1.2 acres <br />since most of the new disturbance is located over areas to be mined out. <br />
The URL can be used to link to this page
Your browser does not support the video tag.