Laserfiche WebLink
E iWiRl <br />S,tate <br />of <br />State.co.us Executive Branch Mail - Fwd: Letter for temperature equipment <br />Fwd: Letter for temperature equipment <br />Bowles - DNR, Brock <brock.bowles @state.co.us> <br />To: Alysha Hernandez - DNR <alysha.hernandez @state.co.us> <br />Thu, Apr 18, 2013 at 1:47 PM <br />Please scan this attached letter for North Thompson Creek (C- 1981 -025) under Hydrology. Note the date on the <br />letter is May 2010. <br />Thank you, Brock <br />---- - - - - -- Forwarded message ---- - - - - -- <br />From: Jim Stover <jesto r @bresnan.net> <br />Date: Thu, Apr 18, 2013 at 6:49 AM <br />Subject: Letter for temperature equipment <br />To: "Bowles - DNR, Brock" < brock. bowles rzstate. co. us> <br />Brock: <br />Attached is a letter to the CDPH &E indicating the temperature and flow monitoring equipment was installed at <br />the North Thompson Creek mine. <br />Jim Stover <br />J. E. Stover & Associates, Inc. <br />2352 N 7th St Unit B <br />Grand Junction, CO 81501 <br />Phone 970 - 245 -4101 <br />Brock Bowles <br />Environmental Protection Specialist <br />Colorado Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />303 - 866 -3567 ext. 8142 <br />LETTER CODPHE FOR NTC DATED 05- 24- 2010.pdf <br />31K <br />https: / /mai l.g oog le.conVmai 1 /u /0 / ?ui =2 &i Ire29129fcb5 &viev�-- pt &search =i nbox&th =13el eafdf88acbf2 1/2 <br />