My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-04-15_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/19/2013 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
4/15/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL4
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 001 Page 74 of 118 <br />Task description: <br />Site: Bowie No. 1 Mine <br />SAFEGUARDING UNDERGROUND OPENINGS <br />Seal OVM and OVWM Vents Shafts <br />Permit Action: Bond Release 4 (SL -4) Permit /Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 118 State: Colorado <br />Date: 3/7/2013 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />UNIT COSTS <br />Abbreviation: None <br />Filename: C038 -118 <br />Opening <br />Description <br />Dimensions <br />Closure Method <br />Quantity <br />Unit <br />Unit <br />Cost <br />Total Cost <br />Vent Shaft Cap <br />200 sf <br />Shaft closure - <br />200.00 <br />SF <br />$105.70 <br />$21,140.00 <br />concrete cap, poured - <br />in- place (per sq. ft.) <br />OVM Vent Shafts <br />48 ea <br />Steel support beam <br />48.00 <br />LF <br />$229.29 <br />$11,005.92 <br />(per In. ft.) <br />B -1 Panels <br />14 ea <br />Prefab concrete panel, <br />14.00 <br />EA <br />$1,104.16 <br />$15,4.58.24 <br />B -1 type, 6ft x 12ft <br />(per panel) <br />B -1 Panel with <br />2 ea <br />Prefab concrete panel, <br />2.00 <br />EA <br />$1,368.21 <br />$2,736.42 <br />Grate <br />B -1 type w /grate, 6ft x <br />12ft (per panel) <br />Job Hours: 160.00 <br />Total Cost: $50,340.58 <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.