Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 63 of 118 <br />1 3800.00 10.00 3.00 13.00 678 5.633 <br />Haul Time: 5.633 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />3800.00 <br />-10.00 <br />3.00 <br />-7.00 <br />3512 <br />1.115 <br />Return Time: 1.115 minutes <br />Total Truck Cycle Time: 10.238 minutes <br />Loading Tool unit <br />Production 1,044.98 LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />243.94 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 4 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 809.89 <br />Adjusted single truck /loader team production: 809.89 <br />Adjusted multiple truck /loader team production: 809.89 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) <br />Unit cost: 52.353 /LCY <br />867.33 LCY /Hour <br />202.47 LCY /Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Total job time: 12.62 Hours <br />Total job cost: $24,050.22 <br />CIRCES Cost Estimating Sofiivare <br />