Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 60 of 118 <br />1 1100.00 10.00 3.00 13.00 678 1.651 <br />Haul Time: 1.651 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />1100.00 <br />-10.00 <br />3.00 <br />-7.00 <br />3512 <br />0.371 <br />Return Time: 0.371 minutes <br />Total Truck Cycle Time: 5.512 minutes <br />Loading Tool unit <br />Production 1,044.98 LCY /Hour Adjusted for job efficiency: 867.33 LCY /Hour <br />Truck Unit Production <br />453.10 LCY /Hour Adjusted for job efficiency: 376.07 LCY /Hour <br />Optimal No. of Trucks: 2 Truck(s) Selected Number of Trucks: 5 Truck(s) <br />Adjusted hourly truck team production: 1,880.37 LCY /Hour <br />Adjusted single truck /loader team production: 867.33 LCY /Hour <br />Adjusted multiple truck /loader team production: 867.33 LCY /Hour <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 0.38 Hours <br />Unit cost: $2.425 /LCY Total job cost: $797.73 <br />CIRCES Cost Estimating Sofiivare <br />