Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 <br />BULLDOZER WORK <br />Task description: Backfill Orchard Valley West Mine Bench <br />Site: Bowie No. 1 Mine Permit Action: Bond Release 4 (SL -4) <br />PROJECT IDENTIFICATION <br />Task #: 017 State <br />Date: 12/19/2012 County <br />User: BFB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D10T - lOSU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Page 4 of 118 <br />Permit /Job #: C1981038 <br />Abbreviation: None <br />Filename: C038 -017 <br />Total unit Cost /Hour: $341.51 <br />Total Fleet Cost /Hour: 51,366.06 <br />MATERIAL QUANTITIES <br />Initial Volume: 11,500 <br />Swell factor: 1.165 <br />Loose volume: 13,398 LCY <br />Source of estimated volume: Remaining volume after SL -02 approval <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 400 feet <br />Unadjusted hourly 497.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />7,300 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Sofiivare <br />Utilization % <br />Ownership Cost /Hour: <br />$110.73 <br />NA <br />Operating Cost /Hour: <br />$183.36 <br />100 <br />Ripper op. Cost /Hour: <br />$10.01 <br />100 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $341.51 <br />Total Fleet Cost /Hour: 51,366.06 <br />MATERIAL QUANTITIES <br />Initial Volume: 11,500 <br />Swell factor: 1.165 <br />Loose volume: 13,398 LCY <br />Source of estimated volume: Remaining volume after SL -02 approval <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: 400 feet <br />Unadjusted hourly 497.3 LCY/hr <br />production: <br />Materials consistency description: Compacted fill or embankment 0.9 <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />7,300 feet <br />2.900 lbs /LCY <br />Weight description: Decomposed rock - 50% Rock, 50% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 0.900 (CAT HB)) <br />CIRCES Cost Estimating Sofiivare <br />