Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 55 of 118 <br />1 10000.00 5.00 3.00 8.00 1023 9.832 <br />Haul Time: 9.832 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />10000.00 <br />-5.00 <br />3.00 <br />-2.00 <br />3569 <br />2.889 <br />Return Time: 2.889 minutes <br />Total Truck Cycle Time: 16.211 minutes <br />Loading Tool unit <br />Production 1,044.98 LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />154.06 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 7 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 639.36 <br />Adjusted single truck /loader team production: 639.36 <br />Adjusted multiple truck /loader team production: 639.36 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: <br />Unit cost: $3.253 /LCY Total job cost: <br />867.33 LCY /Hour <br />127.87 LCY /Hour <br />5 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />5.91 Hours <br />$12,288.12 <br />CIRCES Cost Estimating Sofiivare <br />