Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 53 of 118 <br />TRUCK /LOADER TEAM WORK <br />Task description: Haul Stevens Gulch Topsoil to OVM <br />Site: Bowie No. 1 Mine Permit Action: Bond Release 4 (SL -4) Permit /Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 105 State: Colorado <br />Date: 12/19/2012 County: Delta <br />User: BFB <br />Agency or organization name: DBMS <br />HOURLY EQUIPMENT COST <br />De <br />Truck Loader Team - Truck: Cat 773F <br />- Loader: CAT 990H <br />Support Equipment -Load Area: Cat D10T - IOSU <br />-Dump Area: Cat D10T - IOSU <br />Road Maintenance -Motor Grader: CAT 14M <br />-Water Truck: Water Tanker. 5.000 Gal. <br />Abbreviation: None <br />Filename: C038 -105 <br />Shift basis: 1 per day <br />Cost Breakdown: Truck /Loader Team Support Euuipment Maintenance Euuipment <br />Total work team cost /hour: $2,079.75 <br />MATERIAL QUANTITIES <br />Initial volume: 3388 CCY Swell factor: 1.115 <br />, <br />Loose volume: 3,778 LCY <br />Source of estimated volume: Permit Volume 1, <br />Source of estimated swell factor: CAT Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,100 <br />Description: Earth - Loam <br />Rated Payload: 122,520 <br />Payload Capacity: 58.34 <br />Pounds /LCY <br />Pounds <br />LCY <br />65 <br />CIRCES Cost Estimating Sofiivare <br />Truck <br />Loader <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />75 <br />100 <br />100 <br />50 <br />50 <br />Ownership cost/hour: <br />$60.64 <br />$112.96 <br />$99.15 <br />$99.15 <br />$37.98 <br />$20.80 <br />Operating cost /hour: <br />$119.47 <br />$118.80 <br />$183.36 <br />$183.36 <br />$33.87 <br />$23.27 <br />Ripper op. cost/hour: <br />NA <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />$0.00 <br />Operator coWhour: <br />$25.66 <br />$35.82 <br />$37.41 <br />$37.41 <br />$27.55 <br />$0.00 <br />Unit Subtotals: <br />$205.77 <br />$267.57 <br />$319.93 <br />$319.93 <br />$99.40 <br />$44.07 <br />Number of Units: <br />5 <br />1 <br />1 <br />1 <br />1 <br />1 <br />Group Subtotals: <br />Work: $1,296.42 <br />Support: $639.86 <br />Maint: $143.47 <br />Total work team cost /hour: $2,079.75 <br />MATERIAL QUANTITIES <br />Initial volume: 3388 CCY Swell factor: 1.115 <br />, <br />Loose volume: 3,778 LCY <br />Source of estimated volume: Permit Volume 1, <br />Source of estimated swell factor: CAT Handbook <br />Material Purchase Cost: $0.00 <br />Total Cost: $0.00 <br />HOURLY PRODUCTION <br />Truck Capacity: <br />Truck Payload (weight) Basis: <br />Material weight: 2,100 <br />Description: Earth - Loam <br />Rated Payload: 122,520 <br />Payload Capacity: 58.34 <br />Pounds /LCY <br />Pounds <br />LCY <br />65 <br />CIRCES Cost Estimating Sofiivare <br />