My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-04-15_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/19/2013 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
4/15/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL4
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 001 Page 43 of 118 <br />BULLDOZER WORK <br />Task description: Replace Topsoil from Stockpile to Waste Disposal Area <br />Site: Bowie No. 1 Mine Permit Action: Bond Release 4 (SL -4) Permit /Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 100 State <br />Date: 12/19/2012 County <br />User: BFB <br />Colorado <br />Delta <br />Agency or organization name: DRMS <br />HOURLY EOUIPMENT COST <br />Basic Machine: <br />Cat D10T - 10SU <br />Horsepower: <br />574 <br />Blade Type: <br />Semi - Universal <br />Attachment: <br />3 -shank ripper <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Cost Breakdown: <br />Abbreviation: None <br />Filename: C038 -100 <br />Total unit Cost /Hour: $331.50 <br />Total Fleet Cost /Hour: 51,326.00 <br />MATERIAL QUANTITIES <br />Utilization % <br />Ownership Cost /Hour: <br />$110.73 <br />NA <br />Operating Cost /Hour: <br />$183.36 <br />100 <br />Ripper op. Cost /Hour: <br />$0.00 <br />0 <br />Operator Cost /Hour: <br />$37.41 <br />NA <br />Total unit Cost /Hour: $331.50 <br />Total Fleet Cost /Hour: 51,326.00 <br />MATERIAL QUANTITIES <br />Tnitial Volume: <br />4,321 <br />Swell factor: <br />1.230 <br />Loose volume: <br />5.315 LCY <br />Source of estimated volume: Map - OVWM Topsoil Replacement <br />Source of estimated swell Cat Handbook <br />factor: <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly <br />production: <br />Materials consistency description: <br />Average push gradient: <br />Average site altitude: <br />Material weight: <br />10% <br />300 feet <br />633.3 LCY/hr <br />Consolidated stockpile 1.0 <br />7.100 feet <br />2.100 lbs /LCY <br />Weight description: Earth - Loam <br />Job Condition Correction Factor Source <br />Operator Skill: 0.750 (AVG.) <br />Material consistency: 1.000 (CAT HB) <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.