Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 32 of 118 <br />Task description: <br />Site: Bowie No. 1 Mine <br />HYDRAULIC EXCAVATOR WORK <br />Remove Concrete Pond Dams <br />PROJECT IDENTIFICATION <br />Permit Action: Bond Release 4 (SL -4) <br />Task #: 089 State: Colorado <br />Date: 12/19/2012 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat 336D L 10' -6" Stick <br />Attachment 1: ROPS Cab <br />Cost Breakdown: <br />Permit /Job #: C1981038 <br />Abbreviation: None <br />Filename: C038 -089 <br />Horsepower: <br />268 <br />Weight (MT): <br />29.30 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Total Fleet Cost /Hour: $155.66 <br />MATERIAL QUANTITIES <br />Initial volume: 610 CCY Swell factor: <br />Loose volume: 1,220 LCY <br />Source of estimated volume: 1998 Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded. dump bucket. swing emotv): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />Rated Capacity: 2.26 <br />Bucket Fill Factor: 0.450 <br />Adjusted Capacity: 1.02 <br />Job Condition Correction Factors <br />SEVERE <br />SEVERE <br />0.445 <br />minutes <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Rock - Poorly blasted (40% - 50 %) 0.450 <br />LCY <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />137.12 <br />113.81 <br />113.81 <br />Fleet size: 1 Excavator Total job time <br />Unit cost: $1.368 /LCY <br />Site Altitude: 7000 feet <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />10.72 Hours <br />Total job cost: $1,669.00 <br />CIRCES Cost Estimating Sofiivare <br />Utilization % <br />Ownership Cost /Hour: <br />$42.57 <br />NA <br />Operating Cost /Hour: <br />$79.15 <br />100 <br />Operator Cost /Hour: <br />$33.94 <br />NA <br />Total Unit Cost /Hour: <br />$155.66 <br />Total Fleet Cost /Hour: $155.66 <br />MATERIAL QUANTITIES <br />Initial volume: 610 CCY Swell factor: <br />Loose volume: 1,220 LCY <br />Source of estimated volume: 1998 Operator Estimate <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Excavator Cvcle Time (load bucket. swing loaded. dump bucket. swing emotv): <br />Basic Job Condition Description: <br />Secondary Job Condition within Basic Description: <br />Cycle Time Value: <br />Load Bucket Capacity <br />Rated Capacity: 2.26 <br />Bucket Fill Factor: 0.450 <br />Adjusted Capacity: 1.02 <br />Job Condition Correction Factors <br />SEVERE <br />SEVERE <br />0.445 <br />minutes <br />Bucket Size Class: Medium <br />LCY (heaped) <br />Rock - Poorly blasted (40% - 50 %) 0.450 <br />LCY <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.83 (1 shift /day) <br />Net Correction: 0.83 multiplier <br />Unadjusted Hourly Unit Production: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />137.12 <br />113.81 <br />113.81 <br />Fleet size: 1 Excavator Total job time <br />Unit cost: $1.368 /LCY <br />Site Altitude: 7000 feet <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />10.72 Hours <br />Total job cost: $1,669.00 <br />CIRCES Cost Estimating Sofiivare <br />