My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-04-15_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/19/2013 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
4/15/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL4
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Task description: Cost <br />Site: Bowie No. 1 Mine <br />PROJECT IDENTIFICATION <br />Task #: 001 <br />Date: 12/19/2012 <br />User: BFB <br />COST SUMMARY WORK <br />Permit Action: Bond Release <br />(SL -4) Permit /Job #: C1981038 <br />State: Colorado <br />County: Delta <br />Agency or organization name: <br />TASK LIST (DIRECT COSTS) <br />DRMS <br />Abbreviation: <br />Filename: <br />None <br />C038 -001 <br />Task <br />Description <br />Form <br />Used <br />Fleet <br />Size <br />Task <br />Hours <br />Cost <br />017 <br />019 <br />033 <br />041 <br />045 <br />049 <br />050 <br />052 <br />054 <br />059 <br />064 <br />065 <br />066 <br />078 <br />079 <br />085 <br />086 <br />087 <br />088 <br />089 <br />091 <br />092 <br />093 <br />095 <br />096 <br />100 <br />101 <br />102 <br />103 <br />104 <br />105 <br />106 <br />107 <br />Backfill Orchard Valley West Mine Bench <br />DOZER <br />4 <br />4 <br />1 <br />4 <br />1 <br />1 <br />1 <br />1 <br />1 <br />4 <br />1 <br />1 <br />1 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />4 <br />1 <br />4 <br />1 <br />24.10 <br />$31,963.13 <br />$4,835.97 <br />$3,509.00 <br />$239.00 <br />$1,853.14 <br />$679.00 <br />$1,296.00 <br />$1,296.00 <br />$9.00 <br />$25,706.15 <br />$24.00 <br />$9.00 <br />$233.00 <br />$1,280.22 <br />$265.00 <br />$752.80 <br />$593.25 <br />$542.38 <br />$698.62 <br />$1,669.00 <br />$594.44 <br />$718.96 <br />$255.00 <br />$685.97 <br />$685.97 <br />$6,491.06 <br />$34,129.69 <br />$63,198.18 <br />$15,251.73 <br />$3,772.95 <br />$12,288.12 <br />$589.41 <br />$797.73 <br />Regrade Drill Pads from MR -124 and 125 and TR- <br />38, 49 and 50 <br />DOZER <br />3.54 <br />Compact OVWM Road Backfill <br />COMPACT <br />25.02 <br />Rip Roads <br />RIPPER <br />0.17 <br />2.19 <br />Remove Gravel on Roads to Ponds 3 & 4 <br />SCRAPERl <br />Regrade OVM Light Access Road <br />EXCAVATE <br />4.36 <br />Regrade Timber Storage Area Storage Road <br />EXCAVATE <br />8.32 <br />Regrade Old Waste Disposal Road <br />EXCAVATE <br />8.32 <br />Finish Grade Lower Waste Disposal Road <br />GRADER <br />0.06 <br />Regrade Light Use Roads from MR -125 and TR- <br />38, 49 and 50 <br />DOZER <br />18.82 <br />Finish Grade Upper Waste Disposal Road <br />GRADER <br />0.17 <br />Finish Grade Crusher and Screening Road <br />GRADER <br />0.06 <br />Finish Grade OVM <br />GRADER <br />1.74 <br />Backfill OVM Pipeline Removal Trench <br />DOZER <br />0.97 <br />Establish Irrigation Ditch at Storage <br />EXCAVATE <br />1.70 <br />Backfill and Regrade Pond 1 <br />DOZER <br />0.55 <br />Backfill and Regrade Pond 2 <br />DOZER <br />0.45 <br />Backfill and Regrade Pond 3 <br />DOZER <br />0.41 <br />Backfill and Regrade Pond 4 <br />DOZER <br />0.53 <br />10.71 <br />Remove Concrete Pond Dams <br />EXCAVATE <br />Backfill and Regrade Waste Pile Pond <br />DOZER <br />0.45 <br />Backfill and Regrade Timber Storage Pond <br />DOZER <br />0.54 <br />Backfill and Regrade Coal Stockpile Pond <br />DOZER <br />0.19 <br />Backfill and Regrade Coal Stockpile Pond <br />DOZER <br />0.52 <br />Backfill and Regrade Pond W -2 <br />DOZER <br />0.52 <br />Replace Topsoil from Stockpile to Waste Disposal <br />Area <br />DOZER <br />4.90 <br />Move Fill Topsoil Pile into Stockpiled Area <br />DOZER <br />25.74 <br />Replace Topsoil from Stockpile to OVWM <br />DOZER <br />47.66 <br />Replace Topsoil from Stockpile to Replaced Fill <br />DOZER <br />11.50 <br />Replace Topsoil from Stockpile to OVWM Vent <br />Shaft Access <br />DOZER <br />2.85 <br />Haul Stevens Gulch Topsoil to OVM <br />TRUCKI <br />5.91 <br />Replace Topsoil from Stockpile to Truck Dump <br />Station <br />DOZER <br />0.44 <br />Replace Topsoil from Stockpile to OVM Diversion <br />TRUCKI <br />0.38 <br />
The URL can be used to link to this page
Your browser does not support the video tag.