My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REVISION - C1981038 (2)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981038
>
2013-04-15_REVISION - C1981038 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/19/2013 7:08:00 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981038
IBM Index Class Name
Revision
Doc Date
4/15/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Bowie Resources
Type & Sequence
SL4
Email Name
BFB
SB1
SLB
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
120
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Cost Summary Worksheet Cont'd Task # 001 Page 104 of 118 <br />1 21120.00 0.00 3.00 3.00 2983 7.643 <br />Haul Time: 7.643 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />21120.00 <br />0.00 <br />3.00 <br />3.00 <br />3569 <br />6.131 <br />Return Time: 6.131 minutes <br />Total Truck Cycle Time: 17.264 minutes <br />Loading Tool unit <br />Production 1,101.46 LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />152.48 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 7 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 506.25 <br />Adjusted single truck /loader team production: 506.25 <br />Adjusted multiple truck /loader team production: 506.25 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.37 <br />Unit cost: $3.670 /LCY Total job cost: 58,110.89 <br />914.22 LCY /Hour <br />126.56 LCY /Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Hours <br />CIRCES Cost Estimating Sofiivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.