Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 104 of 118 <br />1 21120.00 0.00 3.00 3.00 2983 7.643 <br />Haul Time: 7.643 minutes <br />Return Route: <br />Seg # <br />Haul Distance <br />Grade ( ° /o) <br />Roll. Res <br />Total Res <br />Velocity <br />Travel <br />(Ft) <br />( ° /a) <br />( %) <br />(fpm) <br />Time <br />(min) <br />1 <br />21120.00 <br />0.00 <br />3.00 <br />3.00 <br />3569 <br />6.131 <br />Return Time: 6.131 minutes <br />Total Truck Cycle Time: 17.264 minutes <br />Loading Tool unit <br />Production 1,101.46 LCY /Hour Adjusted for job efficiency: <br />Truck Unit Production <br />152.48 LCY /Hour Adjusted for job efficiency: <br />Optimal No. of Trucks: 7 Truck(s) Selected Number of Trucks: <br />Adjusted hourly truck team production: 506.25 <br />Adjusted single truck /loader team production: 506.25 <br />Adjusted multiple truck /loader team production: 506.25 <br />JOB TIME AND COST <br />Fleet size: 1 Team(s) Total job time: 4.37 <br />Unit cost: $3.670 /LCY Total job cost: 58,110.89 <br />914.22 LCY /Hour <br />126.56 LCY /Hour <br />4 Truck(s) <br />LCY /Hour <br />LCY /Hour <br />LCY /Hour <br />Hours <br />CIRCES Cost Estimating Sofiivare <br />