Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 100 of 118 <br />Superstructure <br />excavated pit, 10 <br />Slab <br />in. thick - Max. <br />200 ft. push <br />MCC at Loadout <br />672 sqft <br />Demo. and on -site <br />672.00 <br />SF <br />$2.83 <br />$1,901.76 <br />Superstructure <br />disposal in <br />Slab <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft. push <br />Misc Fencing <br />2800 if <br />Fencing, chain <br />2,800.00 <br />LF <br />$2.82 <br />$7,896.00 <br />link, including <br />posts and fabric - <br />8 ft. to 10 ft. high <br />Train Loadout <br />900 sqft <br />Demo. and on -site <br />900.00 <br />SF <br />$2.83 <br />$2,547.00 <br />Superstructure <br />disposal in <br />Slab <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft. push <br />Train Loadout <br />1201f <br />Demo. and on -site <br />120.00 <br />LF <br />$20.37 <br />$2,444.88 <br />Superstructure <br />disposal in <br />Footings <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. <br />200 ft. push <br />Train Loadout <br />1201f <br />Fencing, chain <br />120.00 <br />LF <br />$2.82 <br />$338.40 <br />Superstructure <br />link, including <br />Fence <br />posts and fabric - <br />8 ft. to 10 ft. high <br />Pump House at <br />16280 cf <br />Bldg. (MN) <br />16,280.00 <br />CF <br />$0.20 <br />$3,256.00 <br />Loadout <br />demo. /on -site <br />Superstructure <br />disposal in <br />excavated pit - <br />Max. 200 ft. push <br />Pump House at <br />813 sqft <br />Demo. and on -site <br />813.00 <br />SF <br />$2.83 <br />$2,300.79 <br />Loadout Slab <br />disposal in <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft. push <br />Pump House at <br />1944 sqft <br />Demo. and on -site <br />1,944.00 <br />SF <br />$3.66 <br />$7,116.98 <br />Loadout Walls <br />disposal in <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft. push <br />Railroad Track <br />70881f <br />Railroad track - <br />7,088.00 <br />LF <br />$8.56 <br />$60,673.28 <br />Ties and track <br />Railroad Track <br />1590 cy <br />Railroad track - <br />1,590.00 <br />CY <br />$4.23 <br />$6,725.70 <br />Ballast <br />Ballast <br />Bridge <br />1 bridge <br />USER <br />1.00 <br />ea <br />$156,669.00 <br />$156,669.00 <br />Reclamation <br />PROVIDED <br />(Adjusted <br />ITEM <br />Cyprus <br />Estimate) <br />500 Gallon Fuel <br />500 gal <br />Hazardous waste <br />2.00 <br />DRUM <br />$335.51 <br />$671.02 <br />Tank (2) <br />removal - Drum <br />solids /liquids, per <br />drum, (7+ drum <br />job) <br />500 Gallon Fuel <br />500 gal <br />Remove sludge, <br />2.00 <br />EA <br />$218.50 <br />$437.00 <br />Tank (2) <br />water, and rem. <br />Remove Sludge <br />product from tank <br />CIRCES Cost Estimating Sofiivare <br />