Laserfiche WebLink
Cost Summary Worksheet Cont'd Task # 001 Page 98 of 118 <br />Task description: <br />Site: Bowie No. 1 Mine <br />DEMOLITION WORK <br />Demolish and Remove all Structures at Train Loadout <br />Permit Action: Bond Release 4 (SL -4) Permit /Job #: C1981038 <br />PROJECT IDENTIFICATION <br />Task #: 202 State: Colorado <br />Date: 12/31/2012 County: Delta <br />User: BFB <br />Agency or organization name: DRMS <br />UNIT COSTS <br />98.20% <br />Abbreviation: None <br />Filename: C038 -202 <br />Location adjustment: <br />Structure or <br />Item <br />Dimensions <br />Demolition <br />Quantity <br />Unit <br />Unit Cost <br />Total Cost <br />Description <br />Menu Selection <br />Truck Dump <br />1200 sqft <br />Demo. and on -site <br />1,200.00 <br />SF <br />$2.83 <br />$3,396.00 <br />Superstructure <br />disposal in <br />Slab <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft. push <br />Truck Dump <br />48001f <br />Demo. and on -site <br />4,800.00 <br />LF <br />$20.37 <br />$97,795.20 <br />Superstructure <br />disposal in <br />Footing <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. <br />200 ft. push <br />MCC at Truck <br />364 sqft <br />Demo. and on -site <br />364.00 <br />SF <br />$2.83 <br />$1,030.12 <br />Dump <br />disposal in <br />Superstructure <br />excavated pit, 10 <br />Slab <br />in. thick - Max. <br />200 ft. push <br />Scrubber <br />10 if <br />Demo. and on -site <br />10.00 <br />LF <br />$20.37 <br />$203.74 <br />Superstructure <br />disposal in <br />Footings <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. <br />200 ft. push <br />Tunnel Building <br />1152 sqft <br />Demo. and on -site <br />1,152.00 <br />SF <br />$2.83 <br />$3,260.16 <br />Superstructure <br />disposal in <br />Slab <br />excavated pit, 10 <br />in. thick - Max. <br />200 ft. push <br />Tunnel Building <br />1281f <br />Demo. and on -site <br />128.00 <br />LF <br />$20.37 <br />$2,607.87 <br />Superstructure <br />disposal in <br />Footings <br />excavated pit, 2.0 <br />ft. x 3 ft. - Max. <br />200 ft. push <br />Tunnel Building <br />1440 sqft <br />Demo. and on -site <br />1,440.00 <br />SF <br />$3.66 <br />$5,271.84 <br />Superstructure <br />disposal in <br />Concrete Tunnel <br />excavated pit, 12 <br />in. thick - Max. <br />200 ft. push <br />Truck Scale <br />768 cf <br />Bldg. (SN) <br />768.00 <br />CF <br />$0.18 <br />$135.94 <br />Superstructure <br />demo. /on -site <br />disposal in <br />excavated pit - <br />CIRCES Cost Estimating Sofiivare <br />