Laserfiche WebLink
Table 4 <br />Debeque Gravel Pit SWSP - Water Balance - 2013 and 2014 Plan Years <br />MEI = Call Period <br />Month <br />I lWaAvi>53 <br />1 i( <br />f <br />1 <br />Nov -13 <br />Dec -13 <br />Jan -14 <br />Feb -14 <br />Mar -14 <br />fqu <br />f 414 <br />t =4 <br />Nov -14 <br />Dec -14 <br />Jan -15 <br />Feb -15 <br />Mar -15 <br />2013 Total <br />2014 Total <br />Replacement <br />Requirement <br />(ac -ft) <br />(1) <br />Win ,. <br />39.00 <br />24.16 <br />4.25 <br />2.39 <br />2.14 <br />39.00 <br />24.16 <br />4.25 <br />2.39 <br />2.14 <br />158.73 <br />159.12 <br />Larkin Ditch <br />Replacement <br />Credit <br />(ac -ft) <br />(2) <br />4 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />qjM <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />43.79 <br />43.79 <br />Dewatering <br />Replacement <br />Credit <br />(ac -ft) <br />(3) <br />67.00 <br />67.00 <br />Excess ( +) or <br />Deficit ( -) <br />(ac -ft) <br />(4) <br />-39.00 <br />-24.16 <br />-4.25 <br />-2.39 <br />-2.14 <br />0.06 <br />- 39.00 <br />- 24.16 <br />-4.25 <br />-2.39 <br />-2.14 <br />-47.94 <br />-48.33 <br />(1) From Table 2, Column 10) <br />(2) From Table 3, Column (8) <br />(3) Dewatering of flooded pit to begin mining for 2013. <br />(4) = (2) + (3) - (1) <br />Notes: The shaded months represent the historical call period on the Colorado River <br />Deere & Ault Consultants, Inc. 3/5/2013 Tables 2013- 2014.xlsx <br />