My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-16_REPORT - C1996083 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996083
>
2013-04-16_REPORT - C1996083 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:33 PM
Creation date
4/17/2013 8:24:12 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Report
Doc Date
4/16/2013
Doc Name
2012 Annual Mine Inflow Report
From
Jim Stover
To
DRMS
Permit Index Doc Type
Mine Inflow Reports
Email Name
SLB
SB1
Media Type
D
Archive
No
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
283
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Bowie Resources, LLC April 16, 2013 <br />Bowie No. 2 Mine <br />2012 Annual Hydrology Report <br />by longwall mining during 2001. DH -58 and 58a were eliminated by mining during late <br />2003 so they will no longer be monitored. Drill holes DH -65, DH -66, DH -67D, DH -67blw <br />and DH -67abv were added in conjunction with the Iron Point Federal coal lease, with <br />some monitoring beginning during the fall of 2000. DH -67D was damaged during 2003 <br />so no monitoring was performed. The DH -67 holes were refurbished during 2004. DH- <br />66 was eliminated by mining during early 2004 so it is no longer monitored. <br />Drill holes DD- NM4X98 -27, 28 and 29 were in -mine monitoring holes which were added <br />to the monitoring program during 2003. The three monitoring points were abandoned <br />when the mine activity retreated from the east mains in mid 2004. TC- 03 -01, 02 and 03 <br />were added to the monitoring program during 2003. TC -03 -03 was sealed in 2010 <br />because a ventilation shaft was constructed where TC -03 -03 was located. <br />Drill holes CWI -DH -58 and CWI -DH -60 were added to the monitoring program in 2011 <br />with the approval of permit revision 12 to cover the area west of Terror Creek. The <br />Applicant drilled DH- 2010 -1 SS and DH-2010-113 during 2011. DH-2010-113 is <br />completed in the B -Seam and DH- 2010 -1 SS is completed in a water bearing zone <br />above the B -Seam. <br />Conclusion <br />The results of the hydrologic monitoring conducted during the 2012 season indicate <br />consistent chemical and physical properties when compared with the baseline values <br />provided in the permit application. Longwall mining is the focus of all mining operations <br />at Bowie No. 2 Mine. This mining method has not affected the local hydrology during <br />the current year. Water quality at all monitored sites remains good overall and no <br />chemical or physical impacts have been noted. Except as noted above, none of the <br />field or laboratory parameter results indicate an adverse impact associated with the <br />mining operations of the Bowie No. 2 Mine on the local hydrology. <br />1.1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.