Laserfiche WebLink
Year <br />Production per <br />year (tons) <br />Phase <br />Comments <br />Length of time to <br />complete (years) <br />2013 <br />1 <br />Site Preparation, Construct Ponds, Topsoil stripping, build stockpile <br />along northern permit boundary. <br />0.25 <br />2013 <br />104 000 <br />2 <br />Mine in Mining Area 1, stockpile topsoil. Seed the stockpile Place <br />22.1 <br />2035 <br />overburden on the pit floor. <br />2035 <br />104 000 <br />3 <br />Mine in Mining Area 2, place topsoil on the sideslo and pit floor <br />25.2 <br />2060 <br />of Mining Area 1. Seed and mulch topsoiled area. <br />2060 <br />104,000 <br />4 <br />Mine in Mining Area 3, Place topsoil on the sideslopes and pit floor <br />29.6 <br />2090 <br />of Mining Area 2. Seed and mulch topsoiled area. <br />2090 <br />104 000 <br />5 <br />Mine in Mining Area 4, Place topsoil on the sideslopes and pit floo <br />2� 9 <br />2118 <br />of Mining Area 3. Seed and mulch topsoiled area. <br />2118 <br />104 000 <br />6 <br />Mine in Mining Area 5, Place topsoil on the sideslopes and pit floo <br />4.0 <br />2122 <br />of Mining Area 4. Seed and mulch topsoiled area. <br />Remove scale and mobile equipment. Place stockpiled topsoil on the <br />2122 <br />_ <br />7 <br />pit floor and sideslopes of Mining Area 5 and the pit floor of the <br />1.0 <br />2123 <br />existing pit area. Seed and mulch topsoiled area. <br />Total <br />105.1 <br />Table D -2 Uncompahgre Pit Mining Sequence <br />The mining schedule is planned to minimize disturbance by reclaiming areas as additional <br />mining is undertaken. This table is based on a reasonable projection of average production rates, <br />which can vary significantly. If production and sales increase to 200,000 tons per year, the mine <br />life is shortened to 52.5 years. The table shows that mining and reclamation will occur <br />approximately 105 years and the total gravel sold will be approximately 11 million tons. The <br />large size of this operation allows for the operator to plan for the future as well as the County <br />Planning Department to know there is a long term source of material in this portion of Montrose <br />County. <br />3. Mine Facilities and Operation <br />The crushing and screening will take place within the Mining Area 1. Fuel will be brought to the <br />site by a mobile fueling truck. On site fuel storage needs will vary depending on the plants that <br />are located on site at any one time. The mining, crushing and screening equipment will require a <br />single 3,000 gallon diesel tank which will be located near the crushing /screening plant as shown <br />on map C -2A. A 10,000 gallon tank will be located in the shop /office area as shown on Map C- <br />Uncompahgre Pit, February 2013 D -4 <br />