Laserfiche WebLink
Mining Area <br />Acreage I Topsoil (C.Y.) <br />Overburden (C.Y.) <br />Gravel (tons) <br />2,298,000 <br />Mining Area 1 <br />47.77 <br />77,069 <br />77,069 <br />Mining Area 2 <br />42.22 <br />68,115 <br />68,115 <br />2,622,000 <br />Mining Area 3 <br />43.61 <br />70,357 <br />70,357 <br />3,082,000 <br />Mining Area 4 <br />43.35 <br />13.68 <br />69,938 <br />69,938 <br />2,904,000 <br />413,000 <br />Mining Area 5 <br />22,070 <br />22,070 <br />Total <br />190.63 I 307,550 <br />307,550 <br />11, 319, 000 <br />Montrose County Engineering. This entire new road will be part of the permit area. The access to <br />the shop and office area is directly from T Road. The anticipated haul route will utilize this new <br />Access Road, which converges with T Road east of the residences and then north or south on <br />Highway 550 depending on the location of the project. There is minimal overburden on site, but <br />it averages at approximately 1 foot thick with 1 foot of topsoil above the overburden. The loose <br />gravel deposit is very uniform at approximately 25 -35 feet thick. The deposit tapers out as the <br />terrace transitions from the flat top to the side slopes. Below the loose gravel deposit is shale <br />which is exposed on the side slopes of the terrace. <br />Topsoil will be salvaged from all Mining Areas. The expected topsoil thickness is 12 inches. <br />Initially, topsoil will be stockpiled in the southwest corner of the permit area (See Map C -2A) in <br />Topsoil Stockpile 1. Approximately 77,000 cubic yards of topsoil from Mining Area 1 will be <br />stockpiled here. The topsoil in this stockpile will be used for reclamation. All other topsoil will <br />be salvaged and directly replaced on areas that have been previously excavated. The operation <br />will mine for a few months per year and produce stockpiles to last the remainder of the year. <br />Product sales will occur throughout the year. Crushed product will be stored within the Mining <br />Area 1. All final slopes will be mined to 3H:1 V or less to reduce the amount of reclamation <br />required after mining. In reality, the upper gravel portion of the terrace will be removed, so that <br />the reclaimed slopes in the mining area will actually be milder than 8H:1 V in almost all cases. <br />The overburden will not be stockpiled but directly replaced on the pit floor as it is mined. In <br />addition to the overburden, crusher fines will be placed on top of the shale to provide a deeper <br />growth medium above the shale. The mining areas and stockpiles are shown on Map C -2B. <br />Uncompahgre Pit, February 2013 D -2 <br />Table D -1 Mining Area Material Table <br />