Laserfiche WebLink
8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />Topsoil in this area is 0 to 6 inches, depending on location. For the three drill holes within <br />the pre -law disturbance, no topsoil was encountered. The three drill holes drilled on native <br />grouna aia not involve tne stripping of any topsoil; eacn hole was armed directly tnrougn <br />to r•.nnstriu t any snit of drill pads <br />6 (FORM 2 - Public filing) <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />The three drill holes (1 -3) that are within the proposed 110D permit area are covered in <br />said permit application's reclamation plan and bond. Abandonment and reclamation will be <br />conauctea on tne otner three noses (4- n_)west or tne proposes 11 uu permit. <br />The drill holes pass thrntigh unsaturated unconsnliriatPri material and thin mnrP than 10 <br />feet into bedrock. They will be plugged using sand and fines available from a local <br />construction materials operator. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />N/A <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />