My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-01_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2013-04-01_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:04 PM
Creation date
4/16/2013 4:31:38 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
4/1/2013
Doc Name
OPERATORS RESPONSE TO COMMENT 6
From
OPERATOR
To
DRMS
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
---- - - - - -- Forwarded message ---- - - - - -- <br />From: John Hamrick <John.Hamrick @cotterusa.com> <br />Date: Mon, Apr 1, 2013 at 8:50 AM <br />Subject: Cotter <br />To: "Kaldenbach - DNR, Tom" <tom.kaldenbach @state.co.us> <br />T�X 100 <br />Toni — the adequacy comments should go out today, and here is the answer to question 6. <br />6. Please add to Exhibit E the minimum criteria that must be met before the in -situ trial is terminated and full -scale in -situ <br />treatment begins. <br />In -situ treatment of the mine pool will occur in two stages, the first being the addition of a heavy organic carbon source <br />into the mine as part of the backfill slurry during initial dewatering, which is expected to take up to four months. During <br />this initial dewatering, mine pool conductivity, oxidation /reduction potential (ORP), pH, and temperature will be monitored <br />continuously. Additionally, the constituents in the chart below will be analyzed on a monthly basis to supplement Cotter's <br />current quarterly mine -pool analysis, which shall continue to be performed. If beneficial effects from the initial addition of <br />the heavy carbon source are confirmed, Cotter will proceed with full -scale in -situ treatment of the mine pool at a level at <br />least 150 feet below the Steve level. <br />TDS <br />U <br />SO4 <br />Mo <br />Ra 226 <br />As <br />Ba <br />Fe <br />Table 1. Constituents to be Analyzed Monthly <br />I will also call. <br />John Hamrick <br />Vice President, Mill Operations <br />719 - 275 -7413 x 202 office <br />303 - 332 -1504 cell <br />
The URL can be used to link to this page
Your browser does not support the video tag.