My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-12_INSPECTION - M2007014
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007014
>
2013-04-12_INSPECTION - M2007014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:28 PM
Creation date
4/16/2013 4:31:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007014
IBM Index Class Name
INSPECTION
Doc Date
4/12/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
3/14/2013
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The amount of financial warranty set by the Division for this operation is $216,876.00. You must submit a <br />financial warranty in this amount and a performance warranty in order for us to issue a permit. In the event you <br />have requested a financial warranty form, we have enclosed it in this letter. If you have not, please select a type <br />of financial warranty from Rule 4.3. Then contact us so that we can provide you with the appropriate warranty <br />form. We have enclosed a performance warranty form with this letter for your use. <br />PLEASE NOTE THAT MINING OPERATIONS MAY NOT COMMENCE UNTIL A PERMIT HAS <br />BEEN ISSUED BY THE DIVISION AFTER RECEIPT OF YOUR FINANCIAL WARRANTY AND <br />PERFORMANCE WARRANTY. A PERMIT WILL NOT BE ISSUED UNTIL WE VERIFY THE <br />ADEQUACY OF BOTH YOUR FINANCIAL WARRANTY AND PERFORMANCE WARRANTY. <br />If you have any questions, please contact me at (303) 866 -4179. <br />Sincerely, <br />Enclosure <br />h. Total weight of explosives, used per hole acid 'maximum weight of explosives used per 8- <br />millisecond period; <br />i. Initiation system; <br />j. Type and length of stemming; <br />k. Mats or other protections used; <br />L Type of delay detonator and delay periods used; <br />m. Number of persons in the blasting crew; and <br />n. Seismographic records, where required, including: <br />i. Type of instrument, sensitivity, and the calibration signal of the gain setting or <br />certification of annual calibration; <br />it Exact location of instrument and the date, time and its distance from the blast; <br />iii. Name of the person and firm taking the reading; <br />iv. Name of the person and firm analyzing the seismographic record; <br />v. The vibration level recorded. <br />Deb E. <br />Enviro ental Protection Specialist <br />cc: Tony Waldron, DBMS <br />Jack Clark, Clark Mining Services LLC <br />
The URL can be used to link to this page
Your browser does not support the video tag.