My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-12_INSPECTION - M2007014
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M2007014
>
2013-04-12_INSPECTION - M2007014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:28 PM
Creation date
4/16/2013 4:31:05 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2007014
IBM Index Class Name
INSPECTION
Doc Date
4/12/2013
Doc Name
INSPECTION REPORT
From
DRMS
To
OPERATOR
Inspection Date
3/14/2013
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Common Name <br />No / <br />Acre <br />Type and Size <br />Planting <br />Cost <br />Fertilizer <br />Pellet Cost <br />Cost /Acre <br />1.00 <br />ACRE <br />$153.53 <br />$153.53 <br />Total Mulch Materials Cost /Acre <br />$ <br />Totals Nursery Stock Cost / Acre <br />$0.00 <br />Description <br />Units / <br />Acre <br />Unit <br />Cost / Unit <br />Cost /Acre <br />Hydromulch, 1 ton/ac. rate {Materials Only} <br />1.00 <br />ACRE <br />$153.53 <br />$153.53 <br />Total Mulch Materials Cost /Acre <br />$153.53 <br />Description <br />Cost /Acre <br />Hay bales, staked, >3h: I (MEANS 31 25 14.16 1310) <br />$13.76 <br />Total Mulch Application Cost /Acre <br />$13.76 <br />Description <br />Cost /Acre <br />Broadcast seeding [DMG] <br />$261.28 <br />Total Seed Application Cost /Acre <br />$261.28 <br />Reveg Worksheet Cont'd <br />Totals Seed Mix <br />58.00 <br />Annlication <br />MULCHING and MISCELLANEOUS <br />Materials <br />Annlication <br />NURSERY STOCK PLANTING <br />JOB TIME AND COST <br />Initial Job Cost: <br />Reseeding Job Cost: <br />Total Job Cost: <br />Job Hours: <br />$52,435.00 <br />$5,243.50 <br />$57,678.50 <br />0.00 <br />Task # 003 <br />Page 2 of 2 <br />No. of Acres: 50 Cost /Acre: $1,048.70 <br />Estimated Failure Rate: 10% Cost /Acre *: $1,048.70 <br />*Selected Replanting Work Items: FERTILIZING,TILLING,SEEDING,MU <br />LCHING <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.