Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re- establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />The topsoil is expected to be 12 inches or less in all areas. All soil will be pushed to the <br />edge of the pad and redistributed onto the drill pads immediately following the completion <br />of arming on the site. bon wm be aistributea in approximately equal depths as prior to <br />disturbance. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />All drill holes which do not encounter water (no water is expected in any hole) will be <br />backfilled with rock and cuttings. If any holes encounter water, a plug will be installed at <br />least b feet into the hole ana the top of the hole will be cemented or flied with bentonie to <br />ensure sealing <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />All drill pads will be recovered with soil and reseeded with the seed mixture described <br />below. <br />11. Describe how roads will be reclaimed or returned to their pre - prospecting (or better) condition: <br />All roads will be left in place- t -tbe -r q ies+sf the property owner as the local area has a <br />strong 4x4 community. <br />