My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-15_REPORT - C1980006 (3)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1980006
>
2013-04-15_REPORT - C1980006 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:31 PM
Creation date
4/16/2013 8:45:02 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1980006
IBM Index Class Name
REPORT
Doc Date
4/15/2013
Doc Name
2012 Annual Reclamation Report
From
Kerr Coal Company
To
DRMS
Permit Index Doc Type
Annual Reclamation Report
Email Name
RDZ
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SUMMARY OF DISTURBANCE <br />Mine Area <br />Reclaimed less than 10 years <br />0.0 ac <br />Reclaimed greater than 10 years <br />349.6 ac <br />Areas to be Reclaimed <br />0.0 ac <br />Areas Approved as Permanent <br />40.1 ac <br />Areas Pending Permanent <br />0.0 ac <br />MINE TOTAL <br />389.7 acres <br />Loadout Area <br />Reclaimed 10 years or less <br />0.0 ac <br />Reclaimed greater than 10 years <br />6.9 ac <br />Pond reclaimed (2011) <br />0.2 ac <br />Areas Approved as Permanent <br />4.6 ac <br />LOADOUT TOTAL <br />11.7 acres <br />Marr Mine and Loadout <br />2012 Reclamation Report <br />12.0 TOTAL DISTURBANCE SUMMARY <br />Apr 11, 2013 <br />The following table summarizes the total disturbance at the Marr Mine and Loadout including <br />the reclaimed areas, areas to be reclaimed and the permanent facilities. <br />The attached DRMS form categorizes the reclamation acreage and summarizes the total <br />mining - related disturbance and reclamation at the Kerr /Marr Mine and Loadout since the <br />initiation of mining. <br />Bond Release No.4 (SL -04) included 6.9 acres at the Loadout approved for `Phase 2' Release. <br />The entrance road and shop building (approved as permanent) apparently were not included in <br />the Phase 2 Release. Acreage not yet approved for Phase 3 Bond Release includes the <br />Loadout (11.7 acres) and at the mine site (17 acres) which calculates to 28.7 acres. Total <br />acreage to date that has been released for the Phase 3 Bond Release is 372.7 acres. <br />13.0 FINAL PHASE 3 BOND RELEASE NO.5 (SL -5) <br />The Final Phase 3 Bond Release Request, SL -5, for the Kerr mine site and the Loadout site <br />was submitted to the DRMS on October 29, 2012. A remaining task to be completed prior to <br />bond release approval is the sealing and reclaiming of two shallow alluvial groundwater <br />monitoring wells (AP -1 and AP -2) located at the Loadout site. Due to the timing of the late fall <br />season in 2012, ground frost at the Loadout prevented reclamation of the monitor wells at that <br />time. Sealing and reclaiming the wells is scheduled as soon as ground conditions permit in <br />2013. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.