Marr Mine and Loadout Apr 11, 2013 <br />2012 Reclamation Report <br />3.0 BACKFILLING AND REGRADING <br />The only backfilling activity was done during the previous year, 2011, for the Loadout Pond <br />located at the Kerr Loadout site. After stripping the topsoil from the pond embankments <br />(described in Item 2.0 above) the embankment material was push -dozed to backfill the pond <br />depression and regarded to achieve surface drainage across the site. <br />4.0 OVERBURDEN STOCKPILES <br />No overburden stockpiles remain at the Marr Mine. The primary overburden stockpile at the <br />Marr Mine was removed and the associated disturbance area reclaimed in 1993 -94 in <br />conjunction with reclamation of the 720 Pit. <br />5.0 ROADS <br />In the mine area, the width of both the main entrance road to the facilities area and the access <br />road across Bush Draw north of County Road 12E were reduced in 1995. The remaining road <br />segments are classified as permanent light -use roads for post - reclamation access. The main <br />entrance road serving as access to the facilities area was held out of the Final Bond Release <br />(SL -4) by the DRMS so that they (DRMS) would have continued access to the two remaining <br />parcels that are not yet released at the mine site. <br />In 2005 Kerr requested that the temporary light use road status be changed to permanent for <br />the Pond G access road and 900 feet of the mine entrance road where it merges from the <br />intersection at CR12E with the mine entrance road. The request was in response to the BLM's <br />ability to retain access to their surface properties that are adjacent to the mine. Permanence for <br />the road segments was granted by the DRMS during 2007. <br />6.0 TOPSOILING AND REVEGETATION <br />Ponds C and G, their associated soil stock piles and ditches were reclaimed in September <br />2006. The approved permanent seed mix was drill- seeded at the prescribed rate. Following <br />seeding, the areas were mulched with certified weed free hay which was then crimped into the <br />soil. These ponds and associated areas were included in the SL -4 Final Bond Release <br />approval. <br />Top soiling and mulched seeding was conducted in 1999 on approximately 8 acres within the <br />Mine Area which included the designated disposal area (approximately 4 acres) on the <br />southeast edge of the shop /warehouse facilities pad and the former powder magazine area, soil <br />stockpile area, and associated road (approximate 4 acres). These areas were seeded in 2000 <br />by inter - seeding the permanent seed mix into the standing mulch. The application rate was at <br />the prescribed rate for both grasses (11.5 pounds per acre) and shrubs and forbs (5.75 pounds <br />per acres). <br />Topsoil and revegetation activity pertaining to the Loadout site is explained in Item 2.0 above. <br />6.5 RILLS AND GULLIES <br />No rills or gullies were reported during the reporting period. <br />3 <br />