My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-11_PERMIT FILE - M2013016 (2)
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013016
>
2013-04-11_PERMIT FILE - M2013016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:26 PM
Creation date
4/15/2013 7:37:19 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013016
IBM Index Class Name
PERMIT FILE
Doc Date
4/11/2013
Doc Name
Response
From
OSE
To
DRMS
Email Name
TC1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
DEPARTMENT OF NATURAL RESOURCES <br />DIVISION OF WATER RESOURCES <br />Response to Reclamation Permit Application Consideration <br />DATE: April 11, 2013 <br />40: Timothy A. Cazier, Environmental Protection Specialist <br />CC: Division 2 Office; District 79 Water Commissioner <br />FROM: Caleb Foy, E.I.T.r <br />RE: Orphan View Gravel Pit, File No. M- 2013 -016 <br />Operator: Huerfano County <br />Contact: Joe Gagliano, (719) 240 -9424 <br />Sec. 35, Twp. 26S, Rng. 67W, 6 P.M., Huerfano County <br />CONDITIONS FOR APPROVAL <br />RECEIVED <br />APR 112013 <br />Office of the State Engineer <br />1313 Sherman Street, Suite 818 • Denver, CO 80203 • Phone: 303 - 866 -3581 • Fax: 303 - 866 -3589 <br />http: / /water.state.co.us <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Dick Wolfe, P.E. <br />Director /State Engineer <br />DIVISION OF RECLAMATION <br />MINING AND SAFETY <br />The proposed operation does not anticipate exposing groundwater. Therefore, exposure of ground <br />water must not occur during or after mining operations. If stormwater is contained on -site, it must <br />infiltrate into the ground or be released to the natural stream system within 72 hours, or all work <br />must cease until a substitute water supply plan, or augmentation plan approved by water court, is <br />obtained. Reclamation plans must ensure water will not be retained onsite for more than 72 hours <br />unless an augmentation plan approved by water court is obtained. <br />COMMENTS: The local Water Commissioner, Ray Garcia, may be contacted at (719) 568 -0489 or <br />Ray.Garcia(c�state.co.us. <br />
The URL can be used to link to this page
Your browser does not support the video tag.