My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981012
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981012
>
2013-04-10_REVISION - C1981012
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/11/2013 9:28:07 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012
IBM Index Class Name
REVISION
Doc Date
4/10/2013
Doc Name
Letter & Application
From
New Elk Coal Company
To
DRMS
Type & Sequence
TR67
Email Name
LDS
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Map 11 sheets 1, 2 and 3 have been revised to show the two proposed <br />pump locations plus an alternate location for the well north of the highway. <br />Only one of these two locations will be developed. Sheet 1 shows the <br />access roads servicing these sites; sheet two shows the power lines <br />associated with these wells. Note that the power line to the location north <br />of the highway has already been approved by a previous permitting action. <br />Table 19 has been updated to include these new facilities. Figure 14d, <br />permit page 2.05 -46g, presents a typical mine dewatering well construction <br />configuration. <br />Water well applications have been filed with the Division of Water <br />Resources for these three well sites. A Substitute Water Supply Plan <br />(SWSP) has been filed addressing groundwater depletions and an <br />Augmentation Plan to address these depletions. The aquifer being <br />impacted is tributary to the Purgatoire River downstream of the mine but is <br />not considered a resource supplying domestic, agricultural or industrial <br />water wells. <br />The water line for the well north of the highway will parallel the approved <br />power line located north of the Highway Right -of -way. The six or eight <br />inch line will lie on the surface. If any trenching is required for the <br />construction, the utility locator service will be utilized prior to any <br />excavation. The water line will cross above highway 12, suspended within <br />the RDA conveyor belt structure. Work conducted above the highway will <br />utilize certified flag persons for traffic control conducted in accordance with <br />CDOT requirements. <br />Please contact me at 303 - 300 -8709 if there are any questions regarding <br />this permit revision. <br />Regards, <br />f'1 <br />Ron Thompson <br />
The URL can be used to link to this page
Your browser does not support the video tag.