Laserfiche WebLink
Page 5 of 5 <br />• Overtopping of Prospect Pond. This is relevant because model inputs <br />between the East Pit areas and other portions of the mine, such as the West <br />Pit area, are similar. <br />• The need to rebuild East Taylor Ditch in 2012. <br />• The recent history of exceedances of CDPS limitations for discharges from <br />the East Taylor Pond. While other factors (e.g., algae) may be significant <br />factors, it is prudent to limit (as much as practical) all sources of sediment <br />loads to this pond until it is clear that the problem has been addressed (i.e., <br />there have been approximately four quarters of Discharge Monitoring <br />Reports without exceedances). <br />If you should have any additional questions or concerns please feel free to contact me at <br />your convenience. <br />Sincerely, <br />Robert Zuber, P.E. <br />Environmental Protection Specialist <br />