My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REPORT - C1996084 (2)
DRMS
>
Day Forward
>
Report
>
Coal
>
C1996084
>
2013-04-10_REPORT - C1996084 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/11/2013 7:14:55 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996084
IBM Index Class Name
Report
Doc Date
4/10/2013
Doc Name
Response to 4th Quarter 2012 Excess Spoil Fill Report
From
Zack Trujillo
To
Leigh Simmons
Permit Index Doc Type
Mine Inflow Reports
Email Name
ZTT
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Interoffice Memorandum <br />To: Leigh Simmons <br />From: Zach Trujillo <br />Subject: Lorencito Mine — Review of Forth Quarter 2012 Excess Spoil Fill Reports <br />Date: 4/10/2013 <br />Leigh — <br />Three excess spoil fills were inspected by New Elk Coal Company, LLC and included in their report, spoil fill numbers 7, 8 <br />and 9. All excess spoil fills inspected have been completed, are in final reclamation and has been previously phase one <br />bond released. <br />After my review of Lorencito Mine's Fourth Quarter Excess Spoil Fill Reports for the year 2012, 1 find the report in <br />compliance with the following rules: <br />1. 4.09.1(11)(a) —The fill was inspected for stability quarterly by a qualified professional specialists experienced in <br />construction of earth and rockfill embankments under the direction of a qualified professional engineer during <br />the (5) the revegetation period. There were no signs of stability issues, seeps or springs at any of the spoil fills <br />during the time of these inspections. <br />2. 4.09.1(11)(c) — Rule 4.09(11)(c) is no longer applicable during this stage of construction. <br />After my review of Lorencito Mine's Fourth Quarter Excess Spoil Fill Reports for the year 2012, 1 find the report not in <br />compliance with the following rules <br />1. 4.09.1(11)(b) — Lorencito Mine's excess spoil fills were inspected on December 21, 2012 and received by the <br />Division on August 28, 2012. The Division should receive a certified report within two weeks after the inspection <br />that the waste banks are being constructed as specified in the design approved by the Division. <br />As a reminder as per Rule 4.09.1(11)(b), a copy of these reports should be retained at the mine site. If you have any <br />questions, please feel free to contact me at any time. <br />Sincerely, <br />Zach <br />
The URL can be used to link to this page
Your browser does not support the video tag.