Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 003 <br />Adjusted unit production: 213.90 LCY /hr <br />Adjusted fleet production: 213.9 LCY /hr <br />JOB TIME AND COST <br />Fleet size: <br />Unit cost: <br />Total job time: <br />Total job cost: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />Net correction: 1.1857 <br />1 Dozer(s) <br />$0.606/LCY <br />29.25 Hours <br />$3,794.02 <br />1.200 <br />1.000 <br />0.830 <br />0.900 <br />1.115 <br />1.000 <br />1.438 <br />1.000 <br />(SLOT) <br />(AVG.) <br />(1 SHIFT/DAY) <br />(SSD -FC) <br />(CAT HB) <br />(CAT HB) <br />(CAT HB) <br />(PAT) <br />CIRCES Cost Estimating Software <br />Page 2 of 2 <br />