My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_GENERAL DOCUMENTS - C1981019
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1981019
>
2013-04-10_GENERAL DOCUMENTS - C1981019
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:19 PM
Creation date
4/10/2013 2:38:42 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
General Documents
Doc Date
4/10/2013
Doc Name
Proposed Decision & Findings (PR3)
From
DRMS
To
Colowyo Coal Company
Permit Index Doc Type
Findings
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
74
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
terraces in order to control erosion and enhance stability was approved [4.09.1(9)]. <br />Two valley fills and two temporary overburden stockpiles were approved for the South Taylor <br />area in PR -02. The permanent fills are the West Taylor Fill and the East Taylor Fill. The <br />temporary overburden stockpiles are TS West and TS East. The information on the new valley <br />fills is contained in Permit Volume 12 in Sections 4.09, 4.10, 4.11, 4.12 and 4.13. <br />The West Taylor fill is a valley fill located in the upper west fork of Taylor Creek. The final <br />configuration will contain approximately 10 million cubic yards of material from the initial box - <br />cut for the South Taylor Pit. The fill is approved to have a durable -rock drain built by gravity <br />sorting of dumped overburden materials. CCC is approved to use terrace ditches to divert water <br />off of the face of the fill and to the relief drains on the side. Additionally, 100 -year diversion <br />ditches route clean -water around the fill. Upon completion of the West Taylor Fill, the area will <br />have the topsoil replaced and will be revegetated per the approved reclamation plan. <br />The East Taylor Fill is a valley fill that located in the upper east fork of Taylor Creek. The final <br />configuration will contain approximately 50 million cubic yards of material from the initial box - <br />cut for the South Taylor Pit. The fill is approved to have a durable -rock drain built by gravity <br />sorting of dumped overburden materials. CCC is approved to construct terrace ditches to divert <br />water off of the face of the fill and to the relief drains on the side. Additionally, 100 -year <br />diversion ditches route clean -water around the fill. Upon completion of the East Taylor Fill the <br />area will have the topsoil replaced and it will be revegetated per the approved reclamation plan. <br />Temporary overburden stockpile TS West will be located on the top of the East Taylor Fill, in <br />the upper east fork of Taylor Creek. Engineering designs were submitted to verify the stability <br />of the East Taylor Fill with the additional fill material. Upon the completion of mining in the <br />South Taylor Pit, the material from TS West will be returned to the pit using a truck/shovel <br />operation. The surface (which is the surface of the East Taylor Fill) will then be completed as <br />described above. <br />Temporary overburden stockpile TS East will be located on a previously reclaimed portion of the <br />Section 16 Pit. Upon the completion of mining in the South Taylor Pit, the material from TS <br />East will be returned to the pit using a truck/shovel operation. The surface will then be regraded, <br />topsoil will be replaced and the fill will be revegetated in accordance with the approved <br />reclamation plan. <br />One temporary overburden stockpile is proposed for the Collom area in PR -03. The temporary <br />spoil stockpile will be located in portions of Sections 26, 25, 35 and 36, T4N, R94W, situated <br />between the Little Collom X and Collom Lite pits. The Collom Permit Expansion Area is found <br />to be in compliance with Rule 4.09. Information on temporary excess spoil can be found in <br />Sections 2.05 and 4.09 of Volume 15. <br />The temporary overburden stockpile for the Collom area will be located within the drainage of <br />Colowyo Coal Mine C1981 -019 PR -03 55 April 10, 2013 <br />
The URL can be used to link to this page
Your browser does not support the video tag.