Laserfiche WebLink
Demo Worksheet Con' d Task # TTT Page 65 of 113 <br />Average site altitude <br />Material weight <br />7,500 feet <br />2,650 Ibs /LCY <br />Weight description: Decomposed rock - 25% Rock, 75% Earth <br />Job Condition Correction Factor Source <br />Operator Skill: <br />Material consistency: <br />Dozing method: <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />0.750 <br />(AVG.) <br />0.900 <br />(CAT HB)) <br />1.000 <br />(GEN.) <br />1.000 <br />(AVG. ) <br />0.830 <br />(1 SHIFT /DAY) <br />0.800 <br />(FND -RF) <br />1.000 <br />(CAT HB) <br />1.000 <br />(CAT HB) <br />0.868 <br />(CAT HB) <br />1.000 <br />( PAT) <br />Net correction: 0.3890 <br />Adjusted unit production: <br />Adjusted fleet production <br />JOB TIME AND COST <br />483.60 LCY /hr <br />1934.4 LCY /hr <br />Fleet size: 4 Dozer(s) <br />Unit cost: $0.516/LCY <br />Total job time <br />Total job cost <br />620.02 Hours <br />$618,580.82 <br />CIRCES Cost Estimating Soffivare <br />