My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-04-10_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/10/2013 12:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/10/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Con' d Task # TTT Page 62 of 113 <br />Task description: <br />Site: Colowvo Coal Mine <br />BULLDOZER WORK <br />Little Collom Pond Removal <br />PROJECT IDENTIFICATION <br />Task #: 427 <br />Date: 12/18/2012 <br />10:42:38 AM <br />User: JHB <br />Permit Action: PR3 <br />State: Colorado <br />County: Moffat <br />Agency or organization name: DRMS <br />HOURLY EQUIPM <br />Basic Machine: <br />Horsepower: <br />Blade Type: <br />Attachment: <br />Shift Basis: <br />Data Source: <br />ENT COST <br />Cat D9T - 9SU <br />405 <br />Semi - Universal <br />NA <br />1 per day <br />(CRG) <br />Utilization % <br />Ownership Cost /Hour: $69.88 NA <br />Operating Cost /Hour: $142.13 100 <br />Ripper op. Cost /Hour: $0.00 0 <br />Operator Cost /Hour: $37.41 NA <br />Total unit Cost /Hour: $249.42 <br />Total Fleet Cost /Hour: $249.42 <br />MATERIAL QUANTITIES <br />Initial Volume: <br />11,011 <br />Swell factor: <br />1.125 <br />Loose volume: <br />12,387 LCY <br />Source of estimated volume: <br />Source of estimated swell factor <br />HOURLY PRODUCTION <br />Average push distance: <br />Unadjusted hourly production <br />Materials consistency description <br />Average push gradient: 0% <br />Division of Reclamation, Mining & Safety <br />Cat Handbook <br />100 feet <br />1,243.2 LCY /hr <br />Compacted fill or embankment 0.9 <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -427 <br />CIRCES Cost Estimating Soffivare <br />
The URL can be used to link to this page
Your browser does not support the video tag.