Laserfiche WebLink
Demo Worksheet Con' d Task # TTT <br />MOTOR GRADER WORK <br />Task description: Rough grade 1,452.25 acres reclaimed area (Table 12) <br />Site: Colowyo Coal Mine Permit Action: PR3 <br />PROJECT IDENTIFICATION <br />Task #: 424 State <br />Date: 11/3/2011 County <br />User: JHB <br />Agency or organization name <br />HOURLY EQUIPMENT COST <br />Basic Machine: CAT 16M <br />Ripper Attachment: <br />Colorado <br />Moffat <br />DRMS <br />Permit /Job #: <br />C1981019 <br />Shift Basis: <br />Abbreviation: <br />None <br />Filename: <br />C019 -424 <br />Horsepower: <br />297 <br />Shift Basis: <br />1 per day <br />Data Source: <br />(CRG) <br />Utilization % <br />$63.07 NA <br />$90.35 100 <br />$0.00 <br />$27.55 NA <br />Ownership Cost /Hour: <br />degrees <br />13.90 <br />Operating Cost /Hour: <br />2.00 <br />feet <br />Ripper Operating Cost /Hour: <br />feet <br />4.6879 <br />Operator Cost /Hour: <br />Total Unit Cost /Hour: <br />$180.96 <br />Total Fleet Cost /Hour: <br />$361.93 <br />MATERIAL QUANTITIES <br />Total Area to be graded or ripped: 1,452.25 acres <br />Source of estimated acreage: Table 12 Exh. 13B -T -29, with 85.11 ac. from Table 5 added in <br />HOURLY PRODUCTION <br />Average Grader Speed: <br />Selected Application: <br />Selected Blade Angle: <br />Effective Blade Length: <br />Width of blade overlap per pass: <br />Net grading or ripping width per pass: <br />Unadjusted Hourly Unit Production: <br />Job Condition Correction Factors <br />3.25 mph <br />Heavy blading (0 -6 mph) - 3.25 <br />30 <br />degrees <br />13.90 <br />feet <br />2.00 <br />feet <br />11.90 <br />feet <br />4.6879 <br />acres /hour <br />Source <br />Altitude Adj: 1.00 (CAT HB) <br />Job Efficiency: 0.90 (1sh /d, fay.) <br />Net Correction: 0.9000 multiplier <br />Site Altitude: 7500 feet <br />CIRCES Cost Estimating Soffivare <br />Page 56 of 113 <br />