Laserfiche WebLink
Demo Worksheet Com'd <br />, <br />Task description: <br />Site: Colowvo Coal Mine <br />Task # TTT <br />SCRAPER TEAM WORK <br />Haul Topsoil from TS 25A to Areal <br />PROJECT IDENTIFICATION <br />Permit Action: PR3 <br />Task #: 402 State: Colorado <br />Date: 12/17/2012 County: Moffat <br />3:51:47 PM <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -402 <br />COSTShift basis: 1 per day <br />Equipment Description <br />- Scraper: Cat 637G w /push -pull <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Page 6 of 113 <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br />Total work team cost /hour: $1,608.64 <br />MATERIAL QUANTITIES <br />Initial volume: 119,307 CCY Swell factor: 1.125 <br />Loose volume: 134,220 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />CIRCES Cost Estimating Soffivare <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost /hour: <br />$100.38 <br />NA <br />NA <br />NA <br />$63.07 <br />$20.80 <br />Operating cost /hour: <br />$235.35 <br />NA <br />NA <br />NA <br />$22.59 <br />$11.64 <br />Ripper op. cost /hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost /hour: <br />$30.02 <br />NA <br />NA <br />NA <br />$27.55 <br />$0.00 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />$113.20 <br />$32.44 <br />Number of Units: <br />4 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$1,463.00 <br />Support: <br />$0.00 <br />Maint: <br />$145.64 <br />Total work team cost /hour: $1,608.64 <br />MATERIAL QUANTITIES <br />Initial volume: 119,307 CCY Swell factor: 1.125 <br />Loose volume: 134,220 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />HOURLY PRODUCTION <br />Scraper Bowl (volume) Basis: <br />CIRCES Cost Estimating Soffivare <br />