My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-04-10_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/10/2013 12:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/10/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Demo Worksheet Cont'd Task # TTT Page 4 of 113 <br />SCRAPER TEAM WORK <br />Task description: <br />Site: Colowvo Coal Mine <br />Haul Topsoil from TS 24A to Area 2 (249.14 acres) <br />PROJECT IDENTIFICATION <br />Permit Action: PR3 <br />Task #: 401 State: Colorado <br />Date: 12/17/2012 County: Moffat <br />3:43:31 PM <br />User: JHB <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT <br />Permit /Job #: C1981019 <br />Abbreviation: None <br />Filename: C019 -401 <br />COSTShift basis: 1 per day <br />Equipment Description <br />- Scraper: Cat 637G w /push -pull <br />- Dozer: NA <br />Support Equipment -Load Area: NA <br />-Dump Area: NA <br />Road Maintenance —Motor Grader: CAT 16M <br />-Water Truck: Water Tanker, 5,000 Gal. <br />Cost Breakdown: Scraper Work Team Support Equipment Maintenance Equipment <br />Total work team cost /hour: $4,534.64 <br />MATERIAL QUANTITIES <br />Initial volume: 303,772 CCY Swell factor: 1.125 <br />Loose volume: 341,744 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />CIRCES Cost Estimating Software <br />Scraper <br />Dozer <br />Load Area <br />Dump Area <br />Motor Grader <br />Water Truck <br />%Utilization- machine: <br />100 <br />NA <br />NA <br />NA <br />25 <br />25 <br />Ownership cost /hour: <br />$100.38 <br />NA <br />NA <br />NA <br />$63.07 <br />$20.80 <br />Operating cost /hour: <br />$235.35 <br />NA <br />NA <br />NA <br />$22.59 <br />$11.64 <br />Ripper op. cost /hour: <br />NA <br />NA <br />NA <br />NA <br />$0.00 <br />$0.00 <br />Operator cost /hour: <br />$30.02 <br />NA <br />NA <br />NA <br />$27.55 <br />$0.00 <br />Unit Subtotals: <br />$365.75 <br />NA <br />NA <br />NA <br />$113.20 <br />$32.44 <br />Number of Units: <br />12 <br />0 <br />0 <br />0 <br />1 <br />1 <br />Group Subtotals: <br />Work: <br />$4,389.00 <br />Support: <br />$0.00 <br />Maint: <br />$145.64 <br />Total work team cost /hour: $4,534.64 <br />MATERIAL QUANTITIES <br />Initial volume: 303,772 CCY Swell factor: 1.125 <br />Loose volume: 341,744 LCY <br />Source of estimated volume: Division of Reclamation, Mining & Safety <br />Source of estimated swell factor: Cat Handbook <br />CIRCES Cost Estimating Software <br />
The URL can be used to link to this page
Your browser does not support the video tag.