My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-10_REVISION - C1981019 (4)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1981019
>
2013-04-10_REVISION - C1981019 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:24 PM
Creation date
4/10/2013 12:30:37 PM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981019
IBM Index Class Name
Revision
Doc Date
4/10/2013
Doc Name
Proposed Decision Letter & Form and Cost Estimate
From
DRMS
To
Colowyo Coal Company
Type & Sequence
PR3
Email Name
JHB
DIH
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
119
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866 -3567 <br />FAX: (303) 832 -8106 <br />April 10, 2013 <br />Kurt Blunt <br />Colowyo Coal Company L.P. <br />5731 State Highway 13 <br />Meeker, CO 81641 <br />Re: Colowyo Coal Mine (Permit No. C- 1981 -019) <br />Proposed Decision <br />Permit Revision Application No. 3 (PR -3) <br />Dear Mr. Blunt: <br />COLORADO <br />ID IV I S I O N O F <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />Enclosed you will find the Division of Reclamation, Mining and Safety's Proposed Decision <br />Package for Permit Revision No. 3 at the Colowyo Coal Mine. Notice of the proposed decision <br />will be published in the Craig Daily Press as soon as possible. The first publication will initiate <br />the thirty (30) day public comment period for the Division's decision. <br />Documentation must be submitted to the Division demonstrating that a copy of the approved <br />revision application was sent to the Office of Surface Mining and the Bureau of Land <br />Management. The material should be sent within 15 days of final approval. <br />Please be advised that federal mine plan approval may need to be obtained from the Office of <br />Surface Mining Reclamation and Enforcement (OSM). OSM approval, in addition to State permit <br />approval, is required, before operations affecting federal coal may commence. <br />Please refer to the Performance Bond heading on the enclosed proposed decision form. If the <br />amount of Bond Held equals or exceeds the Revised Liability, you need not submit additional <br />bond. However, if the Revised Liability exceeds the Bond Held, please submit additional bond or <br />rider to your existing bond that equals or exceeds the Revised Liability. This Permit Revision must <br />not be implemented until this proposed decision becomes final and until any required increase in <br />bond is submitted to and approved by the Division. <br />If there are stipulations attached, please sign and return the proposed decision form to the Division. <br />If you have any questions, please contact me. <br />Sincerely, <br />do--- <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines <br />
The URL can be used to link to this page
Your browser does not support the video tag.