My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-08_REVISION - M1977300
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1977300
>
2013-04-08_REVISION - M1977300
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:44:24 PM
Creation date
4/9/2013 11:40:31 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977300
IBM Index Class Name
REVISION
Doc Date
4/8/2013
Doc Name
Response to Adequacy Reviews.
From
Cotter
To
DRMS
Type & Sequence
AM4
Email Name
TAK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Schwartzwalder Mine Pool Accelerated De- Watering with Concurrent InSitu Treatment Schedule <br />Task Name <br />Start 1 _ _Finish - - <br />Mon 9/3/12 Mon 5/22/17 <br />Mon 9/3/12 Fri 12/14/12 <br />Fri 10/19/12 Fri 3/8/13 <br />Mon 9/3/12 Fri 11/23/12 <br />Mon 9/3/12 Fri 9/14/12 <br />Mon 9/3/12 Fri 9/21/12 <br />Mon 9/3/12 Fri 9/28/12 <br />Mon 9/24/12 Fri 9/28/12 <br />Mon 9/3/12 Fri 11/23/12 <br />Mon 10/1/12 Fri 10/5/12 <br />Mon 10/8/12 Fri 4/5/13 <br />Mon 10/8/12 Mon 3/11/13 <br />Mon 10/8/12 Fri 4/5/13 <br />Mon 9/3/12 Mon 6/24/13 <br />Mon 9/3/12 Fri 10/12/12 <br />Tue 113 Mon 6/24/13 <br />Mon 4/1/13 F'i 6/21/13 <br />Mon 4/8/13 Fr '26/13 <br />Mon 4/8/13 Fri 4/26/13 <br />Mon 4/29/13 Fri 5/17/13 <br />Tue 7/2/13 Fri 7/19/13 <br />Tue 7/2/13 Mon 7/8/13 <br />Mon 6/24/13 Fri 7/12/13 <br />Mon 7/22/13 Fri 7/26/13 <br />Mon 7/29/13 Mon 7/29/13 <br />Tue 7/30/13 Mon 12/9/13 <br />Tue 12/10/13 Mon 5/22/17 <br />2010_ 12011 L2012 <br />- -- -- -- --- - --- --- -- -- -- <br />L <br />---- -- -- --- -- -- -- --- <br />DeWater and /or <br />_ 12013 - 2014_ ; 2015 12016 _ 12017 12018 - <br />Accelerated De- watering w/ Concurrent InSitu Treatment <br />Adequacy Review #1 Partial Responses <br />Adequacy Review #2 and #3 Responses <br />Engineering Design <br />Internal Mine Pumps, Pipes etc. <br />External Mine Pumps, Pipes etc. <br />RO System <br />RO Systems Piping Connections <br />InSitu System <br />Internal Approvals <br />Permits /Approvals <br />EPA (UIC) Permit Process <br />DRMS <br />Procurement <br />Pump, Pipes, Valves etc. <br />RO System <br />InSitu System <br />Installation & Testing <br />Internal Mine Pumps, Pipes etc. <br />Extemal Mine Pumps, Pipes etc. <br />RO System <br />Connect RO to Piping Systems <br />InSitu System Installation <br />Integrated System Testing <br />Start Dewatering with Prelim InSltu <br />DeWater w/ InSitu to 150' Below the Steve <br />DeWater and /or InSitu as Req'd <br />■ • <br />go Adequacy Review #1 Partial Responses <br />mg Adequacy Review #2 and #3 Responses <br />A <br />1 Internal Mine Pumps, Pipes etc. <br />-- -- - -- --- --- - --- --- ---- ---- --- - -- - -- -- -- <br />1 External Mine Pumps, Pipes etc. <br />I RO System <br />1 RO Systems Piping Connections <br />• InSitu System <br />I internal Approvals <br />- <br />-- <br />imi EPA (UIC) Permit Process <br />•• DRMS <br />- - <br />g Pump, Pipes, Valves etc. <br />• RO System <br />• InSitu System <br />-- <br />I Internal Mine Pumps, Pipes etc. <br />1 External Mine Pumps, Pipes etc. <br />I RO System <br />I Connect RO to Piping Systems <br />I InSku System installation <br />1 integrated System Testing <br />7/29 • Start Dewatering with Prelim InSitu <br />m DeWater w/ InSitu to 150' Below the Steve <br />InSku as Req'd <br />Mr. Tom Kaldenbach <br />April 5, 2013 <br />Page 2 <br />The revised schedule is shown in Figure 1. <br />Figure 1 - Revised Schwartzwalder Dewatering and Treatment Schedule <br />3. Returning reverse osmosis (RO) concentrate to the water in the underground workings of a <br />uranium mine, and then performing in -situ biologic treatment on the water, is a unique approach <br />to mine water treatment. The outcome of this approach may be unpredictable. Please add to <br />Exhibit E a description of <br />3.a. Previous barrel testing of in -situ biologic treatment (see Section 10.2.2 of Schwartzwalder <br />Mine Hydrologic Evaluation of Mine Closure and Reclamation, 2007) <br />Please see Cotter's response submitted to comment 27 below. <br />3.b. A plan, for conducting pilot -scale testing of disposing RO concentrate and in -situ biologic <br />treatment inside the pumped down mine pool prior to full -scale disposal and treatment inside the <br />pumped down mine pool, <br />Please see Cotter's response submitted to comment 27 below. <br />
The URL can be used to link to this page
Your browser does not support the video tag.