Laserfiche WebLink
DATE <br />JOB <br />MATERIAL <br />BELLY DUMP <br />TANDEM <br />TONS <br />PRICE /TON <br />TOTAL <br />LOADS <br />LOADS <br />4/3/2012 <br />HANCOCK <br />3/4" CRUSHED <br />2 <br />30 <br />$2.35 <br />$70.50 <br />4/7/2012 <br />FRENCH <br />3/4" CRUSHED <br />1 <br />15 <br />$2.35 <br />$35.25 <br />4/23/2012 <br />ISI <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/2/2012 <br />ISI <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/8/2012 <br />NDIC <br />CRUSHER FINES <br />2 <br />30 <br />$2.35 <br />$70.50 <br />5/10/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/12/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/15/2012 <br />NDIC <br />CRUSHER FINES <br />5 <br />75 <br />$2.35 <br />$176.25 <br />5/18/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/19/2012 <br />NDIC <br />CRUSHER FINES <br />2 <br />30 <br />$2.35 <br />$70.50 <br />5/22/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/23/2012 <br />NDIC <br />CRUSHER FINES <br />3 <br />45 <br />$2.35 <br />$105.75 <br />5/24/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/25/2012 <br />NDIC <br />CRUSHER FINES <br />2 <br />30 <br />$2.35 <br />$70.50 <br />5/26/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/27/2012 <br />NDIC <br />CRUSHER FINES <br />4 <br />60 <br />$2.35 <br />$141.00 <br />5/27/2012 <br />NDIC <br />3/4" CRUSHED <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/28/2012 <br />NDIC <br />3/4" CRUSHED <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/28/2012 <br />NDIC <br />CRUSHER FINES <br />1 <br />15 <br />$2.35 <br />$35.25 <br />5/31/2012 <br />NDIC <br />CRUSHER FINES <br />3 <br />45 <br />$2.35 <br />$105.75 <br />6/8/2012 <br />NDIC <br />CRUSHER FINES <br />3 <br />45 <br />$2 35 <br />$105.75 <br />6/11/2012 <br />NDIC <br />3/4" CRUSHED <br />2 <br />30 <br />$2.35 <br />$70.50 <br />7/11/2012 <br />NDIC <br />3/4" CRUSHED <br />1 <br />15 <br />$2.35 <br />$35.25 <br />7/12/2012 <br />NDIC <br />3/4" CRUSHED <br />8 <br />120 <br />$2.35 <br />$282.00 <br />7/13/2012 <br />NDIC <br />3/4" CRUSHED <br />8 <br />120 <br />$2.35 <br />$282.00 <br />7/14/2012 <br />NDIC <br />3/4" CRUSHED <br />9 <br />135 <br />$2.35 <br />$317.25 <br />8/16/2012 <br />ISI <br />3/4" CRUSHED <br />1 <br />25 <br />$2.35 <br />$58.75 <br />8/22/2012 <br />ISI <br />1/2" ROAD BASE <br />1 <br />15 <br />$2.35 <br />$35.25 <br />9/27/2012 <br />NDIC <br />3/4" CRUSHED <br />2 <br />50 <br />$2.35 <br />$117.50 <br />0 <br />$0.00 <br />o <br />$0.00 <br />o <br />$0.00 <br />TOTALS <br />3 <br />67 <br />1080 <br />$2,538.00 <br />BEAVERS CONSTRUCTION CO. <br />HIGH MESA GRAVEL <br />2012 <br />