My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-08_HYDROLOGY - M1988112
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1988112
>
2013-04-08_HYDROLOGY - M1988112
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:15 PM
Creation date
4/9/2013 11:40:20 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988112
IBM Index Class Name
HYDROLOGY
Doc Date
4/8/2013
Doc Name
March 2013 Monthly Report
From
Battle Mountain Resources, Inc.
To
DRMS
Permit Index Doc Type
Hydrology Report
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
April 04, 2013 <br />Mr. Wally Erickson <br />BATTLE MOUNTAIN RESOURCES, INC. <br />State of Colorado <br />Division of Reclamation, Mining and Safety <br />1313 Sherman Street, Room 215 <br />Denver, CO 80203 <br />Re: Battle Mountain Resources Inc. <br />San Luis Project ,� <br />C LRB Permit No. M -88 -I 12 <br />arch 2013 Monthly Report <br />Dear Mr. Erickson: <br />RECEIV <br />APR 2013 <br />�IVI$ION OF RECLAMATION <br />MINING AND SAFE <br />The following summarizes monitoring and site activities at the Battle Mountain Resources Inc. (BMRI), <br />San Luis Project for the month of March, 2013. <br />Surface and ground water monitoring and analysis were completed for all required sites during the month <br />per the terms and conditions of the TR -32 Quality Assurance and Quality Control (QA/QC) plan. <br />Vacuum on the tailing lysimeters was verified on March 29`", no water was present for sampling and <br />subsequent analysis. Lysimeter LD -2 was damaged during inspection and is the process of being repaired. <br />Depths to water were collected for the tailing impoundment main embankment piezometers and the West <br />Pit monitoring wells on March 29 March tailing impoundment piezometer measurements identified <br />these installations were either dry or contained less than 12 inches of water as illustrated in Table 2. <br />Tables 1 and 2 below identify the depth to water measurements collected for each of the site monitoring <br />wells, piezometers and lysimeters as required by the terms and conditions of the TR -32 QA/QC plan. <br />The leak detection system was measured on March 29` A total of 830 gallons of water was excavated <br />from the leak detection system yielding a monthly average of 28.6 gpad. The tailings pond under -drain <br />measured 36gpm. <br />During the month of March the West Pit water treatment plant operated efficiently discharging a total ofO <br />5,932,900 gallons (18.21 acre -feet) of water to Rito Seco Creek and a total of 923,100 gallons (2.83 acre - <br />feet) of water was transferred from the West Pit to the tailings impoundment. Seepage along Rito Seco <br />Creek remained dry during the month. <br />P.O. Box 310 • San Luis, Colorado 81152-0310 • (719) 379 -0798 • Fax (719) 379 -0713 <br />
The URL can be used to link to this page
Your browser does not support the video tag.