My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-03-21_PERMIT FILE - M2013022
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2013022
>
2013-03-21_PERMIT FILE - M2013022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:18:44 PM
Creation date
4/9/2013 10:32:34 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2013022
IBM Index Class Name
PERMIT FILE
Doc Date
3/21/2013
Doc Name
110(2) APPLICATION
From
SHALE TECH
To
DRMS
Email Name
THM
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
102
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
remaining 2,917 cubic yards of overburden will be temporarily stored in the area to the <br />southeast of the northwesterly mining advance (Map E1o). <br />The area to be mined in the 2019 Phase 7 mining cycle would have been cleared of top <br />soil in 2017 and overburden in 2018. The 2019 mining area 60 feet in width by 60 feet in <br />length by 40 feet in depth will be drilled and blasted using same procedures as previous <br />mining operations and will produce approximately 8,600 ton of rubblized oil shale which <br />will be shipped off site for crushing and testing. As in the 2018 mining cycle <br />approximately 1,000 cubic yards of minusl /2 inch material from the offsite crushing <br />operation will be returned to the mine site and blended with overburden. After the <br />rubblized material is hauled from the 60 foot by 60 foot by 40 foot 2019 mined area, <br />overburden from the area to be mined in 2020 will be removed. The 4,323 cubic yards <br />of in place overburden will produce 7,781 cubic yards or 7,003 ton of broken material. <br />5,333 cubic yards of broken overburden will be placed in the 60 foot by 60 foot by 40 <br />foot 2017 mined area and the remaining 2,448 cubic yards of overburden will be <br />temporarily stored in the area to the southeast of the northwesterly mining advance (Map <br />Ell). <br />The area to be mined in the 2020 Phase 8 mining cycle would have been cleared of top <br />soil in 2017 and overburden in 2019. The 2020 mining area 60 feet in width by 60 feet in <br />length by 40 feet in depth will be drilled and blasted using same procedures as previous <br />mining operations and will produce approximately 8,600 ton of rubblized oil shale which <br />will be shipped off site for crushing and testing. As in the 2019 mining cycle <br />approximately 1,000 cubic yards of minusl /2 inch material from the offsite crushing <br />operation will be returned to the mine site and blended with overburden. After the <br />rubblized material is hauled from the 60 foot by 60 foot by 40 foot, 2020 mined area <br />reclamation operations for Reclamation Area #3 and the remainder of affected land will <br />commence (Map E12). <br />Exhibit C attachments: <br />Table C1 <br />Overburden Map E3 <br />Phase 1 Map E4 <br />Phase 2 Map E5 <br />Phase 3 Map E6 <br />Phase 4 Map E7 <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.