Laserfiche WebLink
The office -shop building approved by MR -105 has not been constructed. <br />NECC is proposing to relocate the location of this building to a site adjacent <br />to the Bathhouse /Office Complex. This building will be used as offices and <br />also provide a training room. This is the same building as permitted by MR- <br />105; thus, no additional bond should be required. A covered walkway will <br />be provided between the structures. Figure 2.05 -14c Office Bathhouse <br />Complex is a schematic diagram of the building arrangement. <br />As part of the construction surface lighting (3 poles) will be set along the <br />south edge of the car park and a gate placed across the access road to the <br />bathhouse. Page 2.05 -46d, Figure 14b, has been revised to show these <br />facilities. Three flag poles will be set near the main entrance gate. <br />Table 19 has been updated to list these and other permitted facilities that <br />have been approved but not added to the listing. New listings are in red <br />type. <br />Please contact me at 303 - 300 -8709 if there are any questions regarding <br />this permit revision. <br />Regards, <br />/2 / eryt j <br />Ron Thompson <br />Attachments <br />Application Form <br />Figure 2.05 -14d (Page 2.05 -46d) <br />Figure 2.05 -14c (Page 2.05 -46f) <br />Exhibit 28 -Page 265 <br />Table 19 Surfaces Facilities List (Pages 2.05 -6a, b, c) <br />Table of Contents Page <br />Exhibit 28 Page 265 <br />