My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_GENERAL DOCUMENTS - C1996083
DRMS
>
Day Forward
>
General Documents
>
Coal
>
C1996083
>
2013-04-05_GENERAL DOCUMENTS - C1996083
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:09 PM
Creation date
4/8/2013 9:04:57 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
General Documents
Doc Date
4/5/2013
Doc Name
Proposed Decision and Findings of Compliance (RN3)
From
DRMS
To
Bowie Resources, LLC
Permit Index Doc Type
Findings
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
approval of the haul road in TR -49, the elevated conveyor was not needed and the stipulation was <br />terminated. <br />Stipulation No. 25 required the submittal of maps and revised pages addressing the temporary storage of <br />topsoil from the Hubbard Creek Vent Shaft. Stipulation 25 was complied with MR -84. <br />Stipulation No. 27 required the modification of construction permit 03DL0923F by the Air Pollution <br />Control Division to allow for a greater amount of stockpile material. The construction permit was <br />approved and the stipulation was complied with. <br />Stipulation No. 28 required approval of a lease modification fcl -d- 036955 and associated mine plan with a <br />technical revision into the Bowie No. 2 mine permit application. The stipulation was complied with when <br />TR -70 was approved. <br />There are currently two active stipulations on the permit: <br />Stipulation No. 26 requires that an air quality /construction permits from Air Pollution Control Division <br />(CDPHE) be submitted before coal waste can be transported across the Bowie Road (Old Highway 133) <br />to Coal Waste Pile 43. <br />Stipulation No. 29 requires that prior to placement of cover on the eastern portion of Gob Pile 44, BRL <br />must survey the eastern portion of the pile to verify that slopes are not steeper than 2:1 and regrade any <br />slopes as necessary to ensure conformity with the approved slope design. Documentation of the corrected <br />slopes must be submitted to and approved by the Division before cover can be placed on the eastern <br />portion of the disposal area. The area to be surveyed and regraded is depicted on the February 8, 2013 <br />review drawing submitted with the Technical Revision No. 75 application. <br />�UMMARV <br />The Review Process <br />Since the Midterm Review was conducted by the Division on October 5, 2009, Bowie Resources, LLC <br />has submitted 24 minor revisions, 14 technical revisions, and two permit revisions. <br />Minor Revision No. 112 was approved by the Division on November 2, 2009. The revision updated the B- <br />Seam room and pillar mine plan. <br />Minor Revision No.113 was approved by the Division on November 12, 2009. The revision terminated <br />the temporary monitoring of water flow at the Hubbard Creek Shaft. <br />Minor Revision No.114 was approved by the Division on December 29, 2009. The revision included the <br />Third Quarter 2009 Seismic Monitoring Report. <br />Minor Revision No. 115 was approved by the Division on February 11, 2010. The revision allowed for the <br />installation of three geotechnical exploration holes to determine the appropriate location of the Terror <br />Creek Vent Shaft. <br />
The URL can be used to link to this page
Your browser does not support the video tag.