My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2013-04-05_REVISION - C1996083 (12)
DRMS
>
Day Forward
>
Revision
>
Coal
>
C1996083
>
2013-04-05_REVISION - C1996083 (12)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 5:19:13 PM
Creation date
4/8/2013 8:59:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1996083
IBM Index Class Name
Revision
Doc Date
4/5/2013
Doc Name
Proposed Decision and Findings of Compliance
From
DRMS
To
Bowie Resources, LLC
Type & Sequence
RN3
Email Name
BFB
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
30
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Minor Revision No. 132 was approved by the Division on November 9, 2012. The revision included a <br />revised design and location of the West Diversion Ditch 41 for Gob Pile 42. <br />Minor Revision No. 133 was approved by the Division on November 30, 2012. The revision allowed for <br />the drilling of four utility holes and one gob vent borehole to the B -Seam workings. <br />Minor Revision No. 134 was approved by the Division on March 19, 2013. The revision included allowed <br />for an emergency vent hole in the B 13 Tailgate Entry. <br />Minor Revision No. 135 was approved by the Division on April 2, 2013. The revision included plans for a <br />gob vent borehole (B13C -1) to replace the emergency vent hole approved for construction with Minor <br />Revision No. 135. <br />Technical Revision No. 64 was approved on December 28, 2009. The revision allowed for increased <br />height of Gob Pile 44 to increase storage by 150,000 cubic yards. <br />Technical Revision No. 65 was approved on April 16, 2010. The revision changed the B -Seam mine plan <br />and allowed for drilling of one geotechnical exploration hole. <br />Technical Revision No. 66 was withdrawn by BRL on May 3, 2010. The revision proposed construction <br />of the Terror Creek Vent Shaft. <br />Technical Revision No. 67 was approved on September 20, 2010. The revision allowed for construction <br />of the Terror Creek Vent Shaft. <br />Technical Revision No. 68 was also approved on September 20, 2010. The revision allowed for an <br />incidental boundary revision to facilitate developmental B -Seam mining while Permit Revision No. 12, <br />the West Mine Expansion, was under review. <br />Technical Revision No. 69 was withdrawn by BRL on February 28, 2011. The revision proposed a change <br />in ownership of Bowie Resources, LLC. <br />Technical Revision No. 70 was approved on January 4, 2011. The revision allowed for an incidental <br />boundary revision to include a 152.7 acre lease modification for FCL.D- 036955. <br />Technical Revision No. 71 was approved on February 29, 2012. The revision included a B -Seam mine <br />plan extension to the north. <br />Technical Revision No. 72 was approved on June 20, 2012. The revision allowed for the expansion of <br />Gob Pile 42 increasing capacity by 65,000 cy. <br />Technical Revision No. 73 was also approved on June 20, 2012. The revision allowed for the installation <br />of ten gob vent boreholes and three exploration holes over the B -Seam workings. <br />Technical Revision No. 74 was withdrawn by BRL on September 28, 2012. The revision proposed a <br />second coal cleaning plant. <br />Technical Revision No. 75 was approved with conditions (additional grading requirements) on February <br />11, 2013. The revision incorporated the as -built configuration of Gob Pile 44 into the permit application <br />package. <br />6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.