Laserfiche WebLink
Minor Revision No. 132 was approved by the Division on November 9, 2012. The revision included a <br />revised design and location of the West Diversion Ditch 41 for Gob Pile 42. <br />Minor Revision No. 133 was approved by the Division on November 30, 2012. The revision allowed for <br />the drilling of four utility holes and one gob vent borehole to the B -Seam workings. <br />Minor Revision No. 134 was approved by the Division on March 19, 2013. The revision included allowed <br />for an emergency vent hole in the B 13 Tailgate Entry. <br />Minor Revision No. 135 was approved by the Division on April 2, 2013. The revision included plans for a <br />gob vent borehole (B13C -1) to replace the emergency vent hole approved for construction with Minor <br />Revision No. 135. <br />Technical Revision No. 64 was approved on December 28, 2009. The revision allowed for increased <br />height of Gob Pile 44 to increase storage by 150,000 cubic yards. <br />Technical Revision No. 65 was approved on April 16, 2010. The revision changed the B -Seam mine plan <br />and allowed for drilling of one geotechnical exploration hole. <br />Technical Revision No. 66 was withdrawn by BRL on May 3, 2010. The revision proposed construction <br />of the Terror Creek Vent Shaft. <br />Technical Revision No. 67 was approved on September 20, 2010. The revision allowed for construction <br />of the Terror Creek Vent Shaft. <br />Technical Revision No. 68 was also approved on September 20, 2010. The revision allowed for an <br />incidental boundary revision to facilitate developmental B -Seam mining while Permit Revision No. 12, <br />the West Mine Expansion, was under review. <br />Technical Revision No. 69 was withdrawn by BRL on February 28, 2011. The revision proposed a change <br />in ownership of Bowie Resources, LLC. <br />Technical Revision No. 70 was approved on January 4, 2011. The revision allowed for an incidental <br />boundary revision to include a 152.7 acre lease modification for FCL.D- 036955. <br />Technical Revision No. 71 was approved on February 29, 2012. The revision included a B -Seam mine <br />plan extension to the north. <br />Technical Revision No. 72 was approved on June 20, 2012. The revision allowed for the expansion of <br />Gob Pile 42 increasing capacity by 65,000 cy. <br />Technical Revision No. 73 was also approved on June 20, 2012. The revision allowed for the installation <br />of ten gob vent boreholes and three exploration holes over the B -Seam workings. <br />Technical Revision No. 74 was withdrawn by BRL on September 28, 2012. The revision proposed a <br />second coal cleaning plant. <br />Technical Revision No. 75 was approved with conditions (additional grading requirements) on February <br />11, 2013. The revision incorporated the as -built configuration of Gob Pile 44 into the permit application <br />package. <br />6 <br />